3.68
9925724 R01 - 2014-2015
RZR
XP 1000 /
RZR
XP4 1000 Service Manual
© Copyright 2014 Polaris Industries Inc.
10. Carefully place the cylinder and pistons into the
upper crankcase.
11. Install the Cylinder Holding & Camshaft Timing Plate
2
(PU-50563) onto the cylinder. The cylinder holding
tool retains the cylinder and pistons when the engine
is rotated.
Crankshaft Installation
NOTE: Whether installing a new crankshaft or re-
installing the original, refer to the bearing selection
charts (see Chapter 3 –
Selection, page 3.63 and Connecting Rod Bearing
Selection, page 3.63 ).
1.
Rotate the engine so the cylinder is facing down.
2.
Clean the bearing bore surfaces of upper crankcase
(main bearings), connecting rods and connecting rod
caps.
3.
Align tab of new main bearing
1
with the slot in main
bearing bore of crankcase. Press bearing insert
firmly into place. Repeat for all main bearings.
4.
Align tab of new connecting rod bearings
2
with the
slot in the connecting rod stem and connecting rod
end cap. Press bearing insert firmly into place.
Repeat for the other connecting rod.
5.
Install oil drain diverter
3
into the upper crankcase.
ENGINE / COOLING SYSTEM
Summary of Contents for RZR XP 1000
Page 4: ......
Page 6: ......
Page 525: ...2014 RZR XP 1000 Chassis ...
Page 526: ...2014 RZR XP 1000 Chassis ...
Page 527: ...2014 RZR XP4 1000 Chassis ...
Page 528: ...2014 RZR XP 1000 XP4 1000 Box ...
Page 529: ...2014 RZR XP 1000 INT L Chassis ...
Page 530: ...2014 RZR XP 1000 INT L Chassis ...
Page 531: ...2014 RZR XP 1000 INT L Box ...
Page 532: ...2015 RZR XP4 1000 Chassis ...
Page 533: ...2015 RZR XP4 1000 Chassis ...
Page 534: ...2015 RZR XP 1000 Chassis ...
Page 535: ...2015 RZR XP 1000 Chassis ...
Page 536: ...2015 RZR XP 1000 XP4 1000 Box ...
Page 537: ...2015 RZR XP 1000 INT L Chassis ...
Page 538: ...2015 RZR XP 1000 INT L Chassis ...
Page 539: ...2015 RZR XP 1000 INT L Box ...