3.84
9925724 R01 - 2014-2015
RZR
XP 1000 /
RZR
XP4 1000 Service Manual
© Copyright 2014 Polaris Industries Inc.
Valve Clearance Adjustment
NOTE:
Always inspect valve clearance prior to
camshaft installation or final engine assembly.
1.
Reference
the
camshaft
intake
and
exhaust
markings made during disassembly. If installing new
camshafts or if camshafts were not marked, you can
reference the part number stamped on the end of the
shafts.
Intake Camshaft - PN 1204784
Exhaust Camshaft - PN 1204786
2.
Lubricate the camshaft bearing journal surfaces with
Polaris PS-4 engine oil prior to installation.
3.
Carefully install the camshafts into the cylinder head.
The PTO camshaft lobes
3
should face out as
shown.
4.
Carefully install the rear camshaft carriers onto the
camshafts. Carrier openings should face each other
when installed properly.
5.
Install the four bolts that retain each rear camshaft
carrier
4
&
5
and tighten the bolts evenly to
specification.
Camshaft Carrier Bolts:
7 ft-lb (10 Nm)
6.
Rotate the camshaft until the cam lobes above the
valves you are inspecting are facing up
6
.
7.
Measure the valve clearance
7
using a thickness
(feeler) gauge. Record the measurement if clearance
is out of specification.
ENGINE / COOLING SYSTEM
Summary of Contents for RZR XP 1000
Page 4: ......
Page 6: ......
Page 525: ...2014 RZR XP 1000 Chassis ...
Page 526: ...2014 RZR XP 1000 Chassis ...
Page 527: ...2014 RZR XP4 1000 Chassis ...
Page 528: ...2014 RZR XP 1000 XP4 1000 Box ...
Page 529: ...2014 RZR XP 1000 INT L Chassis ...
Page 530: ...2014 RZR XP 1000 INT L Chassis ...
Page 531: ...2014 RZR XP 1000 INT L Box ...
Page 532: ...2015 RZR XP4 1000 Chassis ...
Page 533: ...2015 RZR XP4 1000 Chassis ...
Page 534: ...2015 RZR XP 1000 Chassis ...
Page 535: ...2015 RZR XP 1000 Chassis ...
Page 536: ...2015 RZR XP 1000 XP4 1000 Box ...
Page 537: ...2015 RZR XP 1000 INT L Chassis ...
Page 538: ...2015 RZR XP 1000 INT L Chassis ...
Page 539: ...2015 RZR XP 1000 INT L Box ...