7
EN
PRELIMINARY OPERATIONS
Checks before installation
►
Gate inspection
The gate must be in good technical condition: check if its construction allows automation.
The gate must be in a horizontal position during the whole displacement cycle; it must open and close
without the necessity of using excessive power. Check if the guide is absolutely perpendicular to the ground
and if there are no obstructions that could prevent proper gate displacement.
►
The presence of gate stops
Gate movement must be controlled by stops firmly fixed to the ground. The stops limit the extreme position
of the
gate during opening while the post performs this function during closing.
Opening stop
Closing stop
Necessary tools
17
12
13
10