33.1 Switch on air compressor
1
2
Fig. 56: Activating the air compressor
1. Activate the air compressor (1).
2. Switch on the machine, turn the selector switch of the pump
motor (2) clockwise
33.2 Open the air tap at the spraying gun
Fig. 57: Opening the air tap
1. Aim the spray gun at the wall to be plastered.
2. Ensure that nobody is in the discharge area of the mortar.
3. Open the air tap (1) at the spraying gun.
4. The machine will start-up automatically via the pressure switch-
off and the mortar emerges.
NOTE!
The correct mortar consistency is reached, if the
material mixes on the surface to be sprayed (we
recommend application on wall surfaces from top to
bottom). If the water quantity is too little even mixing
and spraying is no longer guaranteed; blockages
may form inside the hose and high wear of the
pump parts will become an issue.
NOTE!
It is also possible to operate the machine without
compressed air, e.g. for pumping screed. Switch off
the compressor at the red switch.
Connect the remote control and use it to switch
on/switch off the machine.
33.3 Interruption of work
NOTE!
Always observe the setting time of the material to
be processed:
Clean the system and mortar hoses depending on
the setting time of the material and the length of the
interruption (pay attention to outside temperature).
The guidelines of the material manufacturers have
to be observed regarding breaks.