![PFT RITMO XL FU Operating Instructions Manual Download Page 32](http://html1.mh-extra.com/html/pft/ritmo-xl-fu/ritmo-xl-fu_operating-instructions-manual_1535721032.webp)
Mixing Pump RITMO XL FU 230V Overview – Operation
Operating the machine
32
2019-12-11
30 Operating the machine
30.1 Checking mortar consistency
Fig. 47: Consistency checking tube
1. Connect the consistency checking tube to the mortar pressure
manometer.
2. Place a basket or tub under the consistency checking tube.
Article No. 20104301 Consistency checking tube 25M-section.
30.2 Machine "flying start"
Fig. 48: Switching on
1. Turn main switch (1) to position "I".
2. Close the control circuit by inserting the dummy connector (2) in
the control cabinet.
3. Press the green pushbutton Control voltage "ON" (3).
4. Switch on the machine, turn the selector switch of the pump
motor (3) clockwise.
Fig. 49: Consistency of mortar
5. Check consistency of mortar.
Fig. 50: Switching off
6. Switch off the machine at selector switch (position "0").
7. Remove consistency test tube and clean it.
2
1
3
4