![PFT RITMO XL FU Operating Instructions Manual Download Page 28](http://html1.mh-extra.com/html/pft/ritmo-xl-fu/ritmo-xl-fu_operating-instructions-manual_1535721028.webp)
Mixing Pump RITMO XL FU 230V Overview – Operation
Preparation
28
2019-12-11
24.4 Connection of water supply
Fig. 34: Dirt trapping sieve
1. Unscrew the brass sieve cup (1) with release cock from pressure
reducer.
2. Check whether the dirt trapping sieve (2) in the pressure reducer
is clean.
Sieve for pressure reducer: Article No. 20156000
3. Screw on brass sieve cup (1) again.
4. Shut all water release cocks.
Fig. 35: Connecting water
5. Check whether water inlet sieve in the water inlet (3) is clean.
6. Clean and vent the water hose of the water supply line.
7. Connect water hose and water inlet (3).
8. Remove water hose (4) from mixing tube.
NOTE:
Use clean water free of solids only. The minimum
pressure when the machine is running is 2.5 bar.
NOTE:
Never allow the pump to run dry, as this reduces the
life span of the pump.
24.5 Water from water barrel
Fig. 36: Pressure boosting pump
Fig. 37: Strainer with filter sieve
complete
Pressure boosting pump AV3000 (1) Article No. 00493686
The connected pressure boosting pump ensures the required water
pressure of minimum 2.5 bar.
NOTE:
While working from the water barrel, the strainer
with filter sieve (Article No. 00136619) must be
must be positioned upstream (vent pressure
boosting pump).
NOTE!
Never let the pump run dry as this reduces the
service life of the pump.
2
1
4
3
1