
Getting Ready to Use the Microscope . 47
Setting Up the FT-IR
1.
If necessary switch on the FT-IR.
2.
Leave the source to warm up as directed in the manual for the FT-IR.
The power supply to the detector of the microscope is also switched on
through the FT-IR.
NOTE: It can take an FT-IR up to 2 hours to equilibrate after it has been switched
off overnight. To save time, we suggest that you leave the FT-IR switched
on at all times.
3.
Select the external beam of the FT-IR:
•
Spectrum 100 Series and Spectrum One: Select the beampath to the
microscope using the
Beam
tab of the
Scan and Instrument Setup
dialog.
•
Model 1600, Model 16PC, Spectrum BX or Spectrum RX:
Move the external beam lever, at the front lower left of the FT-IR, as far
to the left as possible.
•
Spectrum GX: Select the beam path to the microscope using the
Spectrum GX Instrument Setup tabs in the Spectrum software.
Summary of Contents for MultiScope System
Page 1: ...MultiScope System Microscope User s Reference ...
Page 5: ...Introduction ...
Page 14: ...14 MultiScope System Microscope User s Reference ...
Page 15: ...Warnings and Safety Information ...
Page 31: ...Overview of the MultiScope System Microscope ...
Page 44: ...44 MultiScope System Microscope User s Reference ...
Page 45: ...Getting Ready to Use the Microscope ...
Page 53: ...Tutorial Using the Microscope ...
Page 63: ...Preparing Samples ...
Page 83: ...Collecting Spectra with the Microscope ...
Page 95: ...Operating the Optional Equipment ...
Page 109: ...Applications ...
Page 122: ...122 MultiScope System Microscope User s Reference ...
Page 123: ...Maintenance ...