
Last printed 9/3/2002
5
7.
Remove the protective plastic wrap from the platform and place the platform on the
spider.
8.
To activate the scale, plug the line cord into any grounded 50/60 hertz 120 volt outlet.
The scale will display the version number of the software installed followed by its
diagnostic countdown process. During this countdown the display will show 9.9.9.9.9.9.
through 0.0.0.0.0.0., each number representing a self-diagnostic test to verify the
operation of important unit functions. If the scale should fail any of these tests the display
will freeze on that number and display an error message, refer to page 23 for a list of
error messages. (The diagnostic failure may be bypassed by pressing the CHECK button.)
The serial interface on all models will also transmit the test numbers. The following table
lists each test and its corresponding display.
INSTALLATION and SET-UP INSTRUCTIONS (7600/4 Indicator)
The 7600/4 Indicator has been packaged for shipment to ensure safe, damage-free arrival.
Please use reasonable care when removing the unit from the shipping carton and retain the origi-
nal packaging materials in case reshipment is required.
NOTE
:
TO PROTECT THE WARRANTY, FILL OUT AND RETURN THE
WARRANTY CARD AND THE SCALE CONDITION REPORT.
The 7600/4 Indicator is designed to be used with a standard load cell type weighing
platform. This platform may be a 1, 2 or 3 mv/v sensitivity and a bridge resistance of 87 to 2000
ohms.
CONNECTING THE 7600/4 IN NON-WASHDOWN APPLICATIONS
All Pensylvania Scale non-washdown weighing platforms are shipped with the proper
mating connector and need only to be plugged into the round CPC style connector on the bottom
of the indicator.
If your 7600/4 indicator is to be attached to a platform of a manufacture other that
Pennsylvania, a mating CPC connector may be ordered and attached top the platform cable.(This
connector is available as a kit form your Pennsylvania distributor, order Part Number 48445). Or
you may follow the connecting instructions for washdown applications, this will not require the
CPC connector. The CPC connector wiring assignments are as follows:
CONNERTOR PIN #
FUNCTION
1
……………………………. + Signal
2
……………………………. - Signal
3
……………………………. Ground