![Patton 1000 Getting Started Manual Download Page 84](http://html1.mh-extra.com/html/patton/1000/1000_getting-started-manual_4020433084.webp)
5 • SmartNode 1400 installation
SmartNode 1000 and 2000 Series Getting Started Guide
84
Mounting the SmartNode 1400
2. Repeat step 1 to install pads on the remaining three corners on the bottom of the SmartNode 1400.
3. Place the unit on a desktop, shelf or other flat, hard, and secure surface.
Note
Allow sufficient space at the rear of the chassis for cable connections. In
addition you should consider the need to access the chassis for future
upgrades, maintenance and troubleshooting. Multiple SmartNodes can be
stacked one atop the other.
Wall-mounted installation
Do the following to install the SmartNode 1400:
1. Using
figure 47
as a guide, determine the positions of the mounting holes on the wall and mark the loca-
tions of the mounting holes.
Figure 47. Wall-mounting hole dimensions
Note
Mounting hardware is not provided. The installer must determine
which fastener is appropriate for that particular application.
2. Install the (user-provided) wall anchors.
Any standard anchoring method may be used, such as wood
screws; butterfly anchors/molly bolts (for installation into a sheetrock/drywall or plasterboard surface); or
expansion bolts (for installation into a concrete or masonry surface). The anchor screw heads must have
just enough clearance to allow the wall-mounting key holes (see
figure 46
on page 83) to slip onto them
when hanging the SmartNode 1400.
3. Hang the SmartNode 1400 on the wall-anchor mounting screws.
Summary of Contents for 1000
Page 12: ...Compliance Information SmartNode 1000 and 2000 Series Getting Started Guide 12 Compliance...
Page 52: ...2 Product Overview SmartNode 1000 and 2000 Series Getting Started Guide 52...
Page 62: ...3 Planning the installation SmartNode 1000 and 2000 Series Getting Started Guide 62...
Page 70: ...4 SmartNode 1200 installation SmartNode 1000 and 2000 Series Getting Started Guide 70...
Page 82: ...5 SmartNode 1400 installation SmartNode 1000 and 2000 Series Getting Started Guide 82...
Page 92: ...6 SmartNode 2300 installation SmartNode 1000 and 2000 Series Getting Started Guide 92...
Page 110: ...7 SmartNode 2400 installation SmartNode 1000 and 2000 Series Getting Started Guide 110...
Page 126: ...8 Line power module installation SmartNode 1000 and 2000 Series Getting Started Guide 126...
Page 134: ...9 Interface card installation SmartNode 1000 and 2000 Series Getting Started Guide 134...
Page 151: ...151 Chapter 11 Monitoring Status Chapter contents Status LEDs 153...
Page 152: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 152...
Page 154: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 154 Status LEDs...
Page 156: ...12 Contacting Patton for assistance SmartNode 1000 and 2000 Series Getting Started Guide 156...
Page 160: ...A Specifications SmartNode 1000 and 2000 Series Getting Started Guide 160...
Page 166: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 166...
Page 175: ...T1 PRI 175 SmartNode 1000 and 2000 Series Getting Started Guide B Cabling...
Page 176: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 176 T1 PRI...
Page 178: ...C Port pin outs SmartNode 1000 and 2000 Series Getting Started Guide 178...