![background image](http://html1.mh-extra.com/html/patton/1000/1000_getting-started-manual_4020433010.webp)
Compliance Information
SmartNode 1000 and 2000 Series Getting Started Guide
10
Compliance
•
TBR 12 & 13 (with E1V Card)
•
AS/ACIF S016:2001 (with E1V Card)
FCC Part 68 (ACTA) Statement (SN2300 & SN2400 with T1V Card)
This equipment complies with Part 68 of FCC rules and the requirements adopted by ACTA. On the bottom
side of this equipment is a label that contains—among other information—a product identifier in the format
US: AAAEQ##TXXXX. If requested, this number must be provided to the telephone company.
The method used to connect this equipment to the premises wiring and telephone network must comply with
the applicable FCC Part 68 rules and requirements adopted by the ACTA.
If this equipment causes harm to the telephone network, the telephone company will notify you in advance
that temporary discontinuance of service may be required. But if advance notice isn’t practical, the telephone
company will notify the customer as soon as possible. Also, you will be advised of your right to file a complaint
with the FCC if you believe it is necessary.
The telephone company may make changes in its facilities, equipment, operations or procedures that could
affect the operation of the equipment. If this happens the telephone company will provide advance notice in
order for you to make necessary modifications to maintain uninterrupted service.
If trouble is experienced with this equipment, for repair or warranty information, please contact our company.
If the equipment is causing harm to the telephone network, the telephone company may request that you dis-
connect the equipment until the problem is resolved.
Connection to party line service is subject to state tariffs. Contact the state public utility commission, public
service commission or corporation commission for information.
Industry Canada Notice (SN2300 & SN2400 with T1V Card)
This equipment meets the applicable Industry Canada Terminal Equipment Technical Specifications. This is
confirmed by the registration number. The abbreviation,
IC
, before the registration number signifies that regis-
tration was performed based on a Declaration of Conformity indicating that Industry Canada technical speci-
fications were met. It does not imply that Industry Canada approved the equipment.
This Declaration of Conformity means that the equipment meets certain telecommunications network protec-
tive, operational and safety requirements. The Department does not guarantee the equipment will operate to
the user's satisfaction. Before installing this equipment, users should ensure that it is permissible to be con-
nected to the facilities of the local telecommunications company. The equipment must also be installed using
an acceptable method of connection. In some cases, the company’s inside wiring associated with a single line
individual service may be extended by means of a certified connector assembly (telephone extension cord). The
customer should be aware that compliance with the above condition may not prevent degradation of service in
some situations. Repairs to some certified equipment should be made by an authorized maintenance facility
designated by the supplier. Any repairs or alterations made by the user to this equipment, or equipment mal-
functions, may give the telecommunications company cause to request the user to disconnect the equipment.
Users should ensure for their own protection that the ground connections of the power utility, telephone lines
and internal metallic water pipe system, are connected together. This protection may be particularly important
in rural areas.
Summary of Contents for 1000
Page 12: ...Compliance Information SmartNode 1000 and 2000 Series Getting Started Guide 12 Compliance...
Page 52: ...2 Product Overview SmartNode 1000 and 2000 Series Getting Started Guide 52...
Page 62: ...3 Planning the installation SmartNode 1000 and 2000 Series Getting Started Guide 62...
Page 70: ...4 SmartNode 1200 installation SmartNode 1000 and 2000 Series Getting Started Guide 70...
Page 82: ...5 SmartNode 1400 installation SmartNode 1000 and 2000 Series Getting Started Guide 82...
Page 92: ...6 SmartNode 2300 installation SmartNode 1000 and 2000 Series Getting Started Guide 92...
Page 110: ...7 SmartNode 2400 installation SmartNode 1000 and 2000 Series Getting Started Guide 110...
Page 126: ...8 Line power module installation SmartNode 1000 and 2000 Series Getting Started Guide 126...
Page 134: ...9 Interface card installation SmartNode 1000 and 2000 Series Getting Started Guide 134...
Page 151: ...151 Chapter 11 Monitoring Status Chapter contents Status LEDs 153...
Page 152: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 152...
Page 154: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 154 Status LEDs...
Page 156: ...12 Contacting Patton for assistance SmartNode 1000 and 2000 Series Getting Started Guide 156...
Page 160: ...A Specifications SmartNode 1000 and 2000 Series Getting Started Guide 160...
Page 166: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 166...
Page 175: ...T1 PRI 175 SmartNode 1000 and 2000 Series Getting Started Guide B Cabling...
Page 176: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 176 T1 PRI...
Page 178: ...C Port pin outs SmartNode 1000 and 2000 Series Getting Started Guide 178...