![background image](http://html1.mh-extra.com/html/patton/1000/1000_getting-started-manual_4020433057.webp)
SmartNode deployment
57
SmartNode 1000 and 2000 Series Getting Started Guide
2 • Product Overview
Figure 32
depicts a SmartNode 2000 series used as a voice gateway and IP router in an SME situation. The
optional IC-4BRV interface card’s BRI 2 port is used as an ISDN fallback interface. In case of a power failure,
equipment connected to port BRI 1 is bypassed with a relay to interface BRI 2. It remains operational even if
the SmartNode 2000 series is not powered. Three ports of the PBX are connected to the remaining BRI ports
of the IC-4BRV interface card, providing up to six concurrent ISDN B-channels. The voice data is transferred
via the integrated voice gateway in the SmartNode 2000 series over Ethernet port ETH 0/0. Depending on the
call procedures defined by the software running in the SmartNode 2000 series, voice data is formatted as
H.323 compliant or as ISoIP voice streams.
Figure 32. SmartNode 2000 Series device connected to a PBX via three BRI ports with fallback to PSTN with
one BRI in an SME environment
Summary of Contents for 1000
Page 12: ...Compliance Information SmartNode 1000 and 2000 Series Getting Started Guide 12 Compliance...
Page 52: ...2 Product Overview SmartNode 1000 and 2000 Series Getting Started Guide 52...
Page 62: ...3 Planning the installation SmartNode 1000 and 2000 Series Getting Started Guide 62...
Page 70: ...4 SmartNode 1200 installation SmartNode 1000 and 2000 Series Getting Started Guide 70...
Page 82: ...5 SmartNode 1400 installation SmartNode 1000 and 2000 Series Getting Started Guide 82...
Page 92: ...6 SmartNode 2300 installation SmartNode 1000 and 2000 Series Getting Started Guide 92...
Page 110: ...7 SmartNode 2400 installation SmartNode 1000 and 2000 Series Getting Started Guide 110...
Page 126: ...8 Line power module installation SmartNode 1000 and 2000 Series Getting Started Guide 126...
Page 134: ...9 Interface card installation SmartNode 1000 and 2000 Series Getting Started Guide 134...
Page 151: ...151 Chapter 11 Monitoring Status Chapter contents Status LEDs 153...
Page 152: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 152...
Page 154: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 154 Status LEDs...
Page 156: ...12 Contacting Patton for assistance SmartNode 1000 and 2000 Series Getting Started Guide 156...
Page 160: ...A Specifications SmartNode 1000 and 2000 Series Getting Started Guide 160...
Page 166: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 166...
Page 175: ...T1 PRI 175 SmartNode 1000 and 2000 Series Getting Started Guide B Cabling...
Page 176: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 176 T1 PRI...
Page 178: ...C Port pin outs SmartNode 1000 and 2000 Series Getting Started Guide 178...