Hardware installation
111
SmartNode 1000 and 2000 Series Getting Started Guide
7 • SmartNode 2400 installation
Hardware installation
SmartNode 2400 installation consists of the following:
Note
If you will be installing the 40V line power module prior to installing
an interface card or ISDN S-Bus, refer to chapter 8,
“Line power
module installation”
on page 125.
•
Installing an interface card (if the card was not installed at the factory). Refer to chapter 9,
“Interface card
installation”
on page 133 to install the card, then return to this chapter.
•
Placing the device at the desired installation location (see section
“Mounting the SmartNode 2400”
on
page 111)
•
Installing the interface and power cables (see section
“Connecting cables”
on page 114)
When you finish installing the SmartNode 2400, go to chapter 10,
“Getting Started with the SmartNode
Device”
on page 139.
Mounting the SmartNode 2400
The SmartNode 2400 should be placed in a dry environment with sufficient space to allow air circulation
for cooling.
Note
For proper ventilation, leave at least 2 inches (5 cm) to the left, right,
front, and rear of the SmartNode 2400.
The SmartNode 2400 can be installed as follows:
•
Placed on a desktop or similar sturdy, flat surface that offers easy access to the cables
•
Mounted inside a 19-inch equipment rack
Note
To prevent overheating we recommend that the SmartNode 2400 not
be installed in a closed rack or in a room that is not properly venti-
lated or air-conditioned.
Summary of Contents for 1000
Page 12: ...Compliance Information SmartNode 1000 and 2000 Series Getting Started Guide 12 Compliance...
Page 52: ...2 Product Overview SmartNode 1000 and 2000 Series Getting Started Guide 52...
Page 62: ...3 Planning the installation SmartNode 1000 and 2000 Series Getting Started Guide 62...
Page 70: ...4 SmartNode 1200 installation SmartNode 1000 and 2000 Series Getting Started Guide 70...
Page 82: ...5 SmartNode 1400 installation SmartNode 1000 and 2000 Series Getting Started Guide 82...
Page 92: ...6 SmartNode 2300 installation SmartNode 1000 and 2000 Series Getting Started Guide 92...
Page 110: ...7 SmartNode 2400 installation SmartNode 1000 and 2000 Series Getting Started Guide 110...
Page 126: ...8 Line power module installation SmartNode 1000 and 2000 Series Getting Started Guide 126...
Page 134: ...9 Interface card installation SmartNode 1000 and 2000 Series Getting Started Guide 134...
Page 151: ...151 Chapter 11 Monitoring Status Chapter contents Status LEDs 153...
Page 152: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 152...
Page 154: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 154 Status LEDs...
Page 156: ...12 Contacting Patton for assistance SmartNode 1000 and 2000 Series Getting Started Guide 156...
Page 160: ...A Specifications SmartNode 1000 and 2000 Series Getting Started Guide 160...
Page 166: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 166...
Page 175: ...T1 PRI 175 SmartNode 1000 and 2000 Series Getting Started Guide B Cabling...
Page 176: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 176 T1 PRI...
Page 178: ...C Port pin outs SmartNode 1000 and 2000 Series Getting Started Guide 178...