![background image](http://html1.mh-extra.com/html/patton/1000/1000_getting-started-manual_4020433064.webp)
3 • Planning the installation
SmartNode 1000 and 2000 Series Getting Started Guide
64
Installation checklist
Installation checklist
The installation checklist in
table 22
lists the tasks for installing a SmartNode 1000 or 2000 series. Make a
copy of this checklist and mark the entries as you complete each task. For each SmartNode 1000 or 2000
series, include a copy of the completed checklist in your site log.
Site Log
Patton recommends that you maintain a site log to record all actions relevant to the system, if you do not
already keep such a log. Site log entries might include information as listed in
table 23
.
Table 22. Installation checklist
Task
Verified by
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Table 23. Site log entries
Entry
Description
Installation
Make a copy of the installation checklist and insert it into the site log
Upgrades and maintenance
Use the site log to record ongoing maintenance and expansion history
Configuration changes
Record all changes and the reasons for them
Maintenance;
Schedules, requirements, and procedures performed
Comments
Notes, and problems
Software
Changes and updates to SmartWare software
Summary of Contents for 1000
Page 12: ...Compliance Information SmartNode 1000 and 2000 Series Getting Started Guide 12 Compliance...
Page 52: ...2 Product Overview SmartNode 1000 and 2000 Series Getting Started Guide 52...
Page 62: ...3 Planning the installation SmartNode 1000 and 2000 Series Getting Started Guide 62...
Page 70: ...4 SmartNode 1200 installation SmartNode 1000 and 2000 Series Getting Started Guide 70...
Page 82: ...5 SmartNode 1400 installation SmartNode 1000 and 2000 Series Getting Started Guide 82...
Page 92: ...6 SmartNode 2300 installation SmartNode 1000 and 2000 Series Getting Started Guide 92...
Page 110: ...7 SmartNode 2400 installation SmartNode 1000 and 2000 Series Getting Started Guide 110...
Page 126: ...8 Line power module installation SmartNode 1000 and 2000 Series Getting Started Guide 126...
Page 134: ...9 Interface card installation SmartNode 1000 and 2000 Series Getting Started Guide 134...
Page 151: ...151 Chapter 11 Monitoring Status Chapter contents Status LEDs 153...
Page 152: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 152...
Page 154: ...11 Monitoring Status SmartNode 1000 and 2000 Series Getting Started Guide 154 Status LEDs...
Page 156: ...12 Contacting Patton for assistance SmartNode 1000 and 2000 Series Getting Started Guide 156...
Page 160: ...A Specifications SmartNode 1000 and 2000 Series Getting Started Guide 160...
Page 166: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 166...
Page 175: ...T1 PRI 175 SmartNode 1000 and 2000 Series Getting Started Guide B Cabling...
Page 176: ...B Cabling SmartNode 1000 and 2000 Series Getting Started Guide 176 T1 PRI...
Page 178: ...C Port pin outs SmartNode 1000 and 2000 Series Getting Started Guide 178...