Monitoring and Testing
4-22
3166-A2-GB20-20
March 1999
Starting a Repeater Loopback
The Repeater Loopback command (RLB) loops the signal being sent to the
network back to the data port. The signal is looped back as close to the network
interface as possible (after it has passed through the framing circuitry of the
DSU/CSU). Framing CRCs and BPVs are corrected.
98-15948
CSU
DSU
NETWORK
INTERFACE
RLB
PORT 1
ALL 1s
Procedure
To perform a Repeater loopback:
1. From the top-level menu screen, select Test.
2. From the Test screen, select Lpbk.
F1
Test:
Rlpbk Lpbk
Ptrns
F2
F3
3. From the Loopback screen, press the
key until the RLB selection
appears on the screen.
4. Select RLB.
F1
Loopback:
LLB
PLB
RLB
F2
F3
Test Started
appears on Line 2. If a Repeater loopback is already in
progress, the
Already Active
message appears. If an invalid combination
of loopbacks is in progress, the error message
Invld Test Combo
appears
(see
Table 4-7
for valid loopback test combinations).
Summary of Contents for 3166 CSU
Page 1: ...ACCULINK 3166 DSU CSU USER S GUIDE Document No 3166 A2 GB20 20 March 1999...
Page 16: ...About This Guide x 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 20: ...Introduction 1 4 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 68: ...SDCP Operation 3 42 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 102: ...SDCP Menu A 2 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 140: ...Pin Assignments D 12 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 166: ...SNMP MIB Objects E 26 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 192: ...Equipment List I 2 3166 A2 GB20 20 March 1999 This page intentionally left blank...