Monitoring and Testing
4-25
3166-A2-GB20-20
March 1999
Aborting Loopbacks
The Abort Loopback command stops all loopback tests or any selected loopback
test currently active on the DSU/CSU.
Procedure
To abort one or more loopback tests:
1. From the top-level menu screen, select Test.
2. From the Test screen, select Lpbk.
F1
Test:
Rlpbk Lpbk
Ptrns
F2
F3
3. From the Loopback screen, select Abort.
F1
Loopback:
Abort
LLB
PLB
F2
F3
4. From the Loopback Abort screen, press the desired Function key to abort All
or one specific loopback test. Use the scroll keys, if necessary.
F1
Loopback: Abort
All
LLB
PLB
F2
F3
When abort is complete, the message
Command Complete
appears on the
Abort screen.
NOTE:
If you mistakenly choose to abort a loopback test that is not currently running,
a
Command Complete
message will still display and the loopback that is
currently active will still be running. Use the TStat branch to view the test
status to determine if the abort was successful.
Summary of Contents for 3166 CSU
Page 1: ...ACCULINK 3166 DSU CSU USER S GUIDE Document No 3166 A2 GB20 20 March 1999...
Page 16: ...About This Guide x 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 20: ...Introduction 1 4 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 68: ...SDCP Operation 3 42 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 102: ...SDCP Menu A 2 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 140: ...Pin Assignments D 12 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 166: ...SNMP MIB Objects E 26 3166 A2 GB20 20 March 1999 This page intentionally left blank...
Page 192: ...Equipment List I 2 3166 A2 GB20 20 March 1999 This page intentionally left blank...