339
DP-2330/3030
MAR 2005
Ver. 2.1
DP-2310/3010
(20) Pull the
FNS Harness
from the bottom hole and
secure with the Harness Clamp.
(21) Connect the
Harness
to CN724 on the SPC PC
Board.
(22) Install the Finisher
IPC PC Board
to CN725 on
the SPC PC Board.
(23) Remove 2
Shoulder Silver Screws
(Upper) and
2
Silver Screws
(Lower).
(24) Remove the
Left Cover
.
(25) Remove 2
Screws
.
(26) Open the
LVPS Cover
.
Summary of Contents for Workio DP-3030
Page 4: ...4 Beispiel DP 2330 3030 Hinweis...
Page 8: ...8 memo...
Page 35: ...35 DP 2330 3030 MAR 2005 Ver 2 1 DP 2310 3010 1 6 Control Panel DP 2310 3010 DP 2330 3030...
Page 454: ...memo...
Page 470: ...memo...
Page 486: ...DZZSM00270...