Aquarea air-to-water heat pumps - Planning and installation manual - 02/2022
Installation
6
6.9.5 Carrying out the system handover and instruction
Carry out the following steps for system handover and instruction:
1. Fill in the commissioning report. Make sure again that all installation and commissioning
work has been carried out fully and correctly.
2. Hand over to the customer all documents and instruct him to keep the documents safe.
Explain to him the operation based on the operating instructions of the respective device and
sign the instructions report and acceptance certification jointly with the customer.