6-1
Unpacking/
Installation
VI. Unpacking/Installation
6. 1 Installation Requirements
Make sure machine is properly leveled from left to right and from front to rear (use
small carpenter level).
The mains plug on this equipment must be used to disconnect mains power. Please
ensure that the socket outlet is installed near the equipment and shall be easily
accessible.
The copier should be installed in a level and well-ventilated area, to minimize the
ozone density in the air.
6.2 Contents Check
Contents
Check
1
Copier
2
Exit tray
3
Document bag
Copier
Exit tray
Multi-sheet bypass tray
14"/
350mm
4"/100mm
28"/
700mm
6.3 Unpacking
Check the condition and contents of the box for any shipping damage and
completeness before installation. (Visual check)
Summary of Contents for FP-7818
Page 8: ......
Page 236: ...27 Sheet Bypass Tray PM102 8 1 7 5 3 4 6 10 11 4 12 13 9 16 15 18 14 4 17 2...
Page 238: ...28 ADU PM801 16 8 1 4 14 12 10 11 11 13 13 6 7 8 16 9 5 3 2 15...
Page 360: ...1 4 7 10 8 9 5 6 2 3 1 Sorter Mounting Assembly...
Page 362: ...1 2 5 J41 3 6 7 8 4A 4 2 Covers...
Page 370: ...A 4 5 2 6 3 4 7 1 9 9 12 10 13 14 15 16 17 18 19 20 21 22 8 J22 M4 M2 J35 A 6 Drive Block...
Page 379: ...1 2 3 4 5 6 7 10 8 9 1 Sorter...
Page 381: ...1 A 3 4 5 12 13 15 9 10 11 6 7 8 16 2 14 13A J202 J202 J104 2 Covers...