10.
RS‑422 connector <RS‑422>
This RS-422 connector (RJ-45) is connected when exercising serial
control over the unit from an external device. Use a cable with the
following specifications for the connection to this connector.
Furthermore, by shorting the R-TALLY signal (2-pin) with the GND
(1-pin), it is possible to light the tally lamp (red) in the camera head
section of the unit.
<NOTE>
• Do not connect PoE cable to the RS-422 port.
• Do not apply a voltage to the R_TALLY_IN signal pin.
• Menu settings enable the output to pin 7 and pin 8 of the red tally
and green tally signals received by the unit. Output is by contact
output, and normally is “OPEN”, then it becomes “MAKE” for output.
(→ page 68)
LAN cable
*
1
(category 5e or above, straight cable),
max. 1000 m (3280 ft)
*
1
Use of an STP (shielded twisted pair) cable is recommended.
Pin
No.
Signal
Pin
No.
Signal
1
GND
5
TXD+
2
R_TALLY_IN
6
RXD+
3
RXD–
7
OPTION_OUT1
4
TXD–
8
OPTION_OUT2
Example OPTION_OUT1, OPTION_OUT2 connector
connections
AW-UE150
OPTION_OUT1
OPTION_OUT2
GND
Voltage: Maximum DC12 V
Current: Maximum 100 mA
11.
Service switches <SERVICE>
Perform switch settings before turning the unit on.
12 V
IN
IR ID AUDIO IN
RS-422
SERVICE
MONI OUT 12G SDI OUT
3G SDI OUT G/L IN
LAN
LINK ACT
OPTICAL
Service switches
Function
Factory settings
SW1
Switches for initialization
(Refer to the explanations in “Initialization 1”
and “Initialization 2”)
OFF
SW2
Always leave at OFF (used for factory
adjustments)
OFF
SW3
OFF
SW4
OFF
Initialization 1
• Reset the user authentication settings and host authentication
settings for network connection.
(This will delete all the registered user information (IDs/passwords)
and host information (IP addresses).)
• With the IR ID switches and service switches set as shown below,
turn on the power of the unit.
SW1
ON
OFF
SW2 SW3 SW4
<NOTE>
• When initialization is complete, the status display lamp on the
front of the unit blinks green. Set the service switches back to their
original positions (SW1 to SW4 all OFF), then restart the unit.
Initialization 2
• The unit is reset to the state it was in at the time of purchase. (All
camera menu setting values and network setting values are reset.)
• With the IR ID switches and service switches set as shown below,
turn on the power of the unit.
SW1
ON
OFF
SW2 SW3 SW4
<NOTE>
• When initialization is complete, the status display lamp on the
front of the unit blinks green. Set the service switches back to their
original positions (SW1 to SW4 all OFF), then restart the unit.
12.
HDMI connector <HDMI>
This is the HDMI video output connector.
13.
3G SDI OUT connector <3G SDI OUT>
This is the 3G SDI video signal output connector.
16
Parts and their functions (continued)