![PALAZZANI RAGNO TSJ 30.1 Operation And Safety Manual Download Page 51](http://html1.mh-extra.com/html/palazzani/ragno-tsj-30-1/ragno-tsj-30-1_operation-and-safety-manual_3298076051.webp)
Tel. 0039 030 6857073 - Fax 0039 030657079 [email protected] - www.palazzani.it
Pag. 42
OM2016_US
With crane:
• using a 4-arms harness of proper capacity and lenght, fi x the hooks in the holes
on top of the stabilizers (Fig. 2.14 and 2.14a).
• lift the machine for load or unloading.
• The logistic personnel must be trained persons, instructed about the loading/unlo-
ading of the machine. Proper procedures and tools must be used for a safe lifting
operation.
!
WARNING
Strictly follow the indications and warning here below to grant stabi-
lity and to avoid any risk related to the machine handling.
Fig. 2.14
Fig. 2.14a