18
5) Adjust for the desired rotation.
6) Tighten the fine-threaded screw (installation torque:
46 Nm
)
5.4 Finishing the Prosthesis
5.4.1 Finishing the prosthetic socket
After the trial fitting of the prosthesis and the alignment of the prosthetic foot, the prosthetic sock
et is finished. Before finishing, the position of the prosthetic foot is marked and the foot is
removed.
Marking the Foot Position
>
Required tools and materials:
Pen, scriber, Allen key (2.5 mm
and
3 mm), sanding tool, 638K8 Plastaband
1) Mark the position of the lamination anchor using a scriber next to the slots in the concave
plate.
2) Mark the position of the setting aid with a pen.
3) Mark the sliding block position on the lamination anchor with a pen.
4) Loosen the fine-threaded screw and remove the foot from the socket.
5) Trace the markings clearly on the surfaces of the lamination anchor.
6) Undo the countersunk head screw on the setting aid using an Allen key and remove the set
ting aid.
7) Sand down the excess resin-talcum mixture on the socket as far as the anchor arms.
8) Seal the openings on the sliding block flush with the surface of the lamination anchor using
Plastaband.
9) Place the lamination dummy on the lamination anchor and screw it on with the screws
provided.
10) Seal the screw holes on the lamination anchor with Plastaband.
Finishing the Prosthetic Socket
>
Required tools and materials:
Soaked 99B81 PVA Bag, 623T9 Nylglas Stockinette, 616G12 Carbon Fibre Cloth, 99B25
Tube Sock, 616G15 Carbon Fibre Woven Hose, 616G13 Fibreglass Woven Hose, 617H55
C-Orthocryl
1) Place two layers of carbon fibre cloth over the anchor arms (see fig. 12).
2) Pull over a tube sock.
3) Pull a carbon fibre woven hose over the distal
third
and tie it off in the groove of the lamina
tion anchor (see fig. 13).
4) Pull the carbon fibre woven hose over the distal
quarter
.
5) Cut a Nylglas stockinette to twice the length of the socket.
6) Pull the Nylglas stockinette once over the socket and tie it off in the groove of the lamination
anchor.
7) Place a layer of carbon fibre cloth over the anchor arms.
8) If a patient with a mobility grade of 3 weighs over
100 kg (220 lbs)
, place additional carbon
fibre cloth over the anchor arms.
9) Fold over the Nylglas stockinette.
10) Perform the lamination process with C-Orthocryl.
11)
Optional:
Leave the casting resin to harden and perform a cast with socket décor fabric.
12)
NOTICE! Do not sand the lamination anchor sliding surface or groove.
After the lamination resin has cured and cooled, remove the lamination dummy.
5.4.2 Installing the prosthetic foot
>
Required materials and tools:
Allen key (2.5 mm), 710D4 Torque Wrench
1) Install the setting aid on the lamination anchor.
Summary of Contents for 1C20 ProSymes
Page 2: ...1 2 3 4 2...
Page 3: ...5 6 7 8 9 10 3...
Page 4: ...11 12 13 4...
Page 139: ...139 2 2 10 C 60 C 0 90 2 3 ISO 10328 2 2 3 3 3 1 3 2 MOBIS...
Page 140: ...140 4 ProSymes 1C20 1 1 1 1 1 2G120 1 SL Spectra Sock 2C2 2Z328 2Z120 5...
Page 154: ...154 26 28 3 m kg 2 3 125 2 2 10 C 60 C 0 90 2 3 ISO 10328 2 2 3 3 3 1 3 2 MOBIS...
Page 155: ...155 4 1C20 ProSymes 1 1 1 1 1 2G120 1 SL Spectra Sock 2C2 2Z328 2Z120 5...
Page 162: ...162 26 28 3 m kg 2 3 125 2 2 10 C 60 C 0 90 2 3 ISO 10328 2 2 3 3 3 1 3 2 MOBIS...
Page 163: ...163 4 1C20 ProSymes 1 1 1 1 1 2G120 1 SL Spectra Sock 2C2 2Z328 2Z120...
Page 168: ...168 5 4 2 2 5 710D4 1 2 3 46 4 5 6 30 7 8 8 1 8 2 93 42 IX I VII 9 25 26 27 28 10 5 43 52...
Page 170: ...170 26 28 3 m kg 2 3 125 kg 275 2 2 10 C 60 C 0 90 2 3 ISO 10328 200 2 3 3 3 1 3 2 MOBIS...
Page 171: ...171 1 4 1C20 ProSymes 1 1 1 1 1 2G120 1 SL Spectra Sock 2C2 2Z328 2Z120 5...
Page 177: ...177 26 28 3 m kg 2 3 125 kg 2 2 10 C 60 C 0 90 2 3 ISO10328 2 2 3 3 3 1 3 2 MOBIS...
Page 178: ...178 4 1C20 ProSymes 1 1 1 1 1 2G120 1 SL Spectra Sock 2C2 2Z328 2Z120 5...
Page 184: ...184 4 1C20 ProSymes 1 1 1 1 1 2G120 1 SL Spectra Sock 2C2 2Z328 2Z120...
Page 189: ...189...
Page 190: ...190...
Page 191: ...191...