B_PM_UMCbox_en05.doc
5-2
Maintenance
ÖSTLING Markiersysteme GmbH
1
General Guidelines for maintenance
Note
Unprofessional usage of controls or marking head voids the warranty.
General guidelines for maintenance:
•
With all adjustments, maintenance and repair works, the control must
always be switched off and the marking unit must be separated from the
power supply. For that purpose, pull the power supply plug before opening
the unit. Exceptions of it, with which the unit must remain switched on
during appropriate work, are noted in the maintenance instructions in each
case.
•
With work on pneumatics:
-
Turn off and lock the compressed air supply.
-
Wait at least 5 s after turning off the compressed air supply, until the
pressure diminishes itself.
-
Examine whether the operating pressure dropped on 0 bar. Read off
the current operating pressure from the appropriate manometer.
Summary of Contents for PinMark UMC box
Page 14: ...B_PM_UMCbox_en01 doc 1 8 Safety ÖSTLING Markiersysteme GmbH ...
Page 32: ...B_PM_UMCbox_en03 doc 3 12 Description ÖSTLING Markiersysteme GmbH ...
Page 91: ...B_PM_UMCbox_en07 doc ÖSTLING Markiersysteme GmbH Index 7 1 Chapter 7 Index ...
Page 94: ...B_PM_UMCbox_en07 doc 7 4 Index ÖSTLING Markiersysteme GmbH ...
Page 96: ...B_PM_UMCbox_en08 doc 8 2 Drawings parts lists ÖSTLING Markiersysteme GmbH ...
Page 98: ...B_PM_UMCbox_en09 doc 9 2 EC declaration of conformity ÖSTLING Markiersysteme GmbH ...
Page 100: ......
Page 102: ...B_PM_UMCbox_en10 doc 10 2 Service request ÖSTLING Markiersysteme GmbH ...
Page 104: ......