SECTION 3 - CHASSIS & TURNTABLE
3-100
3121171
21.
Assemble the five or seven special bolts (1) and screw in
finger tight. Remove and replace the two alignment
studs with bolts after the other bolts are in place. Alter-
nately and progressively tighten bolts to pull end cover
and other components into place with a final torque of
22-26 ft- lb for five bolts or 45-55 ft-lb (61-75 Nm) for the
seven 3/8-24 threaded bolts.
NOTE:
Special bolts required for use with the relief or shuttle valve
(24) end cover assembly (2) are longer than bolts required
with standard and cover assembly. Refer to individual ser-
vice parts lists or parts list charts for correct service part
number if replacement is required.
22.
Torque two shuttle valve plug assemblies (21) in end
cover assembly to 9-12 ft-lb (12-16 N m) if cover is so
equipped.
23.
Torque the two relief valve plug assemblies (21) in end
cover assembly to 45-55 ft-lb (61-75 N m) if cover is so
equipped.
One Piece Stator Construction
A disassembled rotor (8A) stator (8B) and vanes (8C) that can-
not be readily assembled by hand can be assembled by the
following procedures.
1.
Place stator (8B) onto wear plate (9) with seal ring (4)
side down, after following Torqlink™ assembly proce-
dures 1 through 13. Be sure the seal ring is in place.
2.
If assembly alignment studs are not being utilized, align
stator bolt holes with wear plate and housing bolt holes
and turn two bolts (1) finger tight into bolt holes
approximately 180 degrees apart to retain stator and
wear plate stationary.
Go to
Discount-Equipment.com
to
order your
parts