72
Version 4.2: Aug 26, 2015
XIII.
ROUTINE MAINTENANCE SCHEDULE
a. Weekly
•
Using a suitable disinfectant, disinfect the inside of the workstation and the work surface.
Please refer to the “Cleaning and decontamination” section of this manual for further
information
b. Monthly (or more often as required)
•
Using a damp cloth and clean the exterior surfaces of workstation, particularly the front and top of the
workstation to remove any accumulated dust.
•
Clean and disinfect the humidification device
•
All weekly activities.
Please refer to the “Cleaning and decontamination” section of this manual for further
information
c. Quarterly or Semiannually
If equipped, have the MARS workstation VOC pre-filters by a qualified certification technician.
All monthly activities.
d. Annually
•
Have the MARS workstation re-certified by a qualified certification technician.
•
Silicone replacement tubing for humidifying system.
•
Check the microscope optics and all accessories
•
All monthly activities.
Summary of Contents for MARS 1200 CLASS II
Page 1: ...Mars Workstation User Manual...
Page 2: ...Version 4 2 Aug 26 2015...
Page 21: ...Version 4 2 Aug 26 2015 21...
Page 22: ...22 Version 4 2 Aug 26 2015...
Page 23: ...Version 4 2 Aug 26 2015 23...
Page 24: ...24 Version 4 2 Aug 26 2015...