-
30
-
3.1.4
Installation control cabinet
Now the control cabinet (
) must be moved to
a suitable position. The individual cable lengths are 10
m. Therefore, make sure that the switch cabinet is no
further than 10 m from the cameras or breakage
sensor. Furthermore, make sure that it is not mounted
in the immediate vicinity of hot ambient temperatures.
Furthermore, it should be easily accessible, because
the trigger signal from the oven must be connected
here.
Figure 14
:
Control cabinet
The cables of the cameras, the pyrometer and the shutter boxes can be disassembled for easier cable
laying. The cables on the cameras and pyrometer are screwed and can be easily unscrewed for
disassembly. When reassembling the cables, make sure that the master and slave of the cameras are not
mixed up.
The cables are marked according to the wiring diagram and, for better orientation, blue color marks the
master and the red color marks the slave.
Summary of Contents for Bottom-Up GIS 450i G7
Page 1: ...Operators Manual Bottom Up GIS 640i G7 and 450i G7 Glass Inspection System ...
Page 11: ... Technical Data 11 Figure 1 Dimensions mm shutter system ...
Page 12: ... 12 Figure 2 Dimensions mm control cabinet ...
Page 13: ... Technical Data 13 Figure 3 Dimensions mm CTL 4M ...
Page 20: ... 20 CTL 4M FF optics Figure 5 spot size diagram ...
Page 27: ... Installation 27 Figure 10 camera distance ...
Page 44: ... 44 Figure 27 Linescan in PIX Connect software customized Layout ...
Page 52: ... 52 Appendix A Control cabinet Figure 34 Wiring diagram of control cabinet ...
Page 57: ...Bottom Up GIS MA E2022 04 A ...