34
-
After the installation the software can be opened. When using the camera for the first
time, the calibration files must be downloaded from the Internet. This happens
automatically, your PC hast to be connected to the internet. Alternatively, they can also
be downloaded from the USB stick.
3.2.3
Set up of the Software PIX Connect
The software starts with a so-called standard layout. There are two special predefined layouts included in the
software package. These are already customized for the glass system and contain all the necessary settings.
To load them, you must first import them from the stick into the software. In the menu, go to
Tools
→
Layouts
→
Layots import/export
→
Layouts import
and select the two pre-configured layouts from the
stick.
The software already contains two predefined layouts called "
BUGIS_Operation
”,
“
BUGIS_Demo
” and “
BUGIS_Setup
”. You can load these layouts in the menu under
Tools
and
Load layout
and use it as a presetting.
The layout named "
BUGIS_Setup
" is used for aligning the cameras and
BUGIS_Demo
for demonstration
and is set to be used for temperatures from 0 to 250°C.
The layout named "
BUGIS_Operation
" has been configured for the actual glass measurement. Here the
temperature range of 150-900 °C is set.
Summary of Contents for Bottom-Up GIS 450i G7
Page 1: ...Operators Manual Bottom Up GIS 640i G7 and 450i G7 Glass Inspection System ...
Page 11: ... Technical Data 11 Figure 1 Dimensions mm shutter system ...
Page 12: ... 12 Figure 2 Dimensions mm control cabinet ...
Page 13: ... Technical Data 13 Figure 3 Dimensions mm CTL 4M ...
Page 20: ... 20 CTL 4M FF optics Figure 5 spot size diagram ...
Page 27: ... Installation 27 Figure 10 camera distance ...
Page 44: ... 44 Figure 27 Linescan in PIX Connect software customized Layout ...
Page 52: ... 52 Appendix A Control cabinet Figure 34 Wiring diagram of control cabinet ...
Page 57: ...Bottom Up GIS MA E2022 04 A ...