
LBL-2008-41-v5 OptoMonitor 3 IFU_en Rev 2021-08
97
|
P a g e
15
Appendix A: OptoMonitor 3 Installation Instructions
The following instructions give explanations on how to install the HU, DU, OU and PSU on the bedrail.
Please note that this is a suggested installation.
Assembly 1
Step 1
Step 2
Step 3
Installing the
Bedrail Post
Clamp on
the IV pole
Instructions
Insert the IV pole in the
Bedrail post clamp
Tighten the clamping handle
on the back of the Bedrail
post clamp.
Slide the Bedrail post clamp
on the bedrail, adjust the
pole accordingly, and tighten
the clamping handle on the
bottom of it.