
LBL-2008-41-v5 OptoMonitor 3 IFU_en Rev 2021-08
90
|
P a g e
Leakage Current Measurement
The OptoMonitor 3 is a fiber optic platform-based system. Perform measurement of device leakage
current per hospital standard procedure.
Visual Inspection
General Routine Inspection
You should perform a visual inspection before every use, or in accordance with your hospital’s policy.
With the OptoMonitor 3 switched off:
•
Examine unit exteriors for cleanliness and general physical condition. Make sure that the
housings are not cracked or broken, that everything is present, that there are no spilled liquids
and that there are no signs of abuse.
•
Make sure all cables connected to the OptoMonitor 3 are locked into place and do not pull out
without releasing the locking mechanism.
•
Inspect all accessories (cables, pressure guidewire and so forth). If any signs of damage are
observed, do not use.
•
Inspect all cables and their strain reliefs for general condition. Make sure there are no breaks in
the insulation. Make sure that the connectors are properly engaged at each end to prevent
rotation or other strain.
Annual Visual Inspection
The OptoMonitor 3 and its components should be carefully inspected once every 12 months.
Handle Unit - Cap
Handle Unit – Optical connector (Male)
Optical Unit – Female Optical Connector