Statistics
69
AS7200 User Manual - OPEX Corporation use only - not for distribution
Overall System Performance Measures statistics
The table below lists the terms that appear in the Overall System Performance
Measures section of the statistics report.
Table 3: Overall System Performance Measures terms
Term
Definition
Input
Number of pieces fed into the machine.
Output
Number of pieces successfully processed by the machine. This
number is figured by subtracting the number of rejects from the
number of pieces input.
Jam Rate
Number of jams per run. The formula for the Jam Rate is:
Rejects
Number of pieces rejected.
Feed Rate
Number of pieces per hour the AS7200 is currently feeding.
The formula for the Feed Rate is:
Output Rate
Number of pieces per hour the AS7200 is processing. The
formula for the Output Rate is:
Jam Clear
Time
Average time the AS7200 was halted while the Operator was
clearing a jam. The formula for the Jam Clear Time is:
Reference
Feed Rate
Number of pieces fed into the AS7200 per hour. The formula
for the Reference Feed Rate is:
Reference
Output Rate
Number of pieces processed by the AS7200. The formula for
the Reference Output Rate is:
Jam Rate = Input
Jams
Feed Rate =
Input * 7200
Active Job Time (seconds)
Output Rate =
Output * 7200
Active Job Time (seconds)
Jam Clear
Jam Time (seconds)
Jams
Time (seconds) =
Reference
Input * 7200
Run Time (seconds) + (Jams * Ref. Jam Clear Time (seconds))
Feed Rate
=
Reference
Output * 7200
Run Time (seconds) + (Jams * Ref. Jam Clear Time (seconds))
Output Rate
=