![background image](http://html.mh-extra.com/html/omron/zx2-ld100/zx2-ld100_user-manual_1633410027.webp)
Installation
27
ZX2 User’s Manual
INTRODUCTION
BASIC
SETUP
PREPARATION
FOR
MEASUREMENT
TROUBLE-
SHOOTING
INDEX
CONTENTS
SETTING
TRANSITION
CHARTS
FLOW OF
OPERATION
MAIN
APPLICATIONS
& SETTING
METHODS
DETAILED
SETTINGS
SPECIFI-
CATIONS
Height
Double
Sheet
Detection
Positioning
Eccentricity
and Surface
Deflection
Steps
and
Warpage
Thickness
Connection Method
1
Open the connector cover on the Amplifier Unit.
Open the connector cover by lifting and sliding it.
2
Mount the Calculating Unit to the DIN Track.
3
Slide and connect the Calculating Unit to the Amplifier Unit connector.
4
Slide and connect the second Amplifier Unit to the Calculating Unit
connector.
5
Fix in place with the End Plate (sold separately: PFP-M).
• To disconnect Amplifier Units and Calculating Units, perform the above operations in reverse
order.
• The following diagram shows the channel numbers when multiple Amplifier Units are
connected.
1
5
5
1
2
3
4
Important
CH1
CH2
CH3
CH4
CH5