![background image](http://html1.mh-extra.com/html/omron/sc20g2/sc20g2_operation-manual_742413021.webp)
The detail description of a screen
1.
Test Day
Please set up a test execution day in a week.
2.
Test Time
Please set the test execution time.
3.
Test Action
Please specifies one of the following whether you carry
out the self-test.
•
Backup time test
A backup time test is done.
•
Self test
A self-diagnosis test is done.
19