2-1
Starting the Ladder Monitor
39
Note
•
The communications path that was being used for the Ladder Monitor will be saved
when the Ladder Monitor is exited. This communications path will be used by
default the next time the Ladder Monitor is started.
•
If the communications path that was last used for the Ladder Monitor is not saved
when the Ladder Monitor is started, a search will be automatically made in the
following order for PLCs to be monitored.
Serial A, Serial B, Ethernet, Controller Link, and Controller. (For Ethernet or
Controller Link, monitoring will be performed for the first PLC registered in as a host.
“Controller” is used only for an NSJ PLC.)
•
If a PLC that can be monitored is not found when the Ladder Monitor is started or the
host is being changed, the
Change Host
Dialog Box will appear. Select the
Comms.
Method
to connect to the PLC.
Summary of Contents for ns series
Page 2: ......
Page 15: ...NS Series Ladder Monitor OPERATION MANUAL LADDER MONITOR ...
Page 18: ......
Page 19: ...Section 1 Introduction ...
Page 31: ...Section 2 Installation ...
Page 43: ...Section 3 Basic Operation ...
Page 93: ...Section 4 Troubleshooting ...
Page 100: ...4 1 Troubleshooting 4 1 4 Error Message When Using Programming Console Function 98 ...
Page 101: ...Appendices ...
Page 106: ...A 2 Standard Models 104 ...
Page 107: ...NS Series Ladder Monitor OPERATION MANUAL I O Comment Extracting Tool ...
Page 109: ...Section 1 Introduction ...
Page 118: ...1 5 Specifications 12 ...
Page 119: ...1 5 Specifications Section 2 Installation ...
Page 121: ...2 1 Installing the I O Comment Extracting Tool Section 3 Basic Operation ...
Page 128: ...3 3 Uninstalling the I O Comment Extracting Tool 22 ...
Page 129: ...Appendix ...
Page 131: ......