![background image](http://html1.mh-extra.com/html/omron/cj1w-drm21/cj1w-drm21_operation-manual_742341034.webp)
Precautions for Correct Use
32
CJ-series DeviceNet Units Operation Manual for NJ-series CPU Unit(W497)
• Be sure to install a replacement Battery within two years of the production date shown on the Battery
label.
• Turn ON the power after replacing the Battery for a CPU Unit that has been unused for a long time.
Leaving the CPU Unit unused again without turning ON the power even once after the Battery is
replaced may result in a shorter Battery life.
• When you replace the Battery, use the CJ1W-BAT01 Battery Set.
• Insert the SD Memory Card all the way.
• Do not turn OFF the power supply to the Controller during SD Memory Card access. The files may be
corrupted.
If there is a corrupted file in the SD Memory Card, the file is automatically deleted by the restoration
function when the power supply is turned ON.
Battery Replacement
SD Memory Cards
Summary of Contents for CJ1W-DRM21
Page 12: ...Manual Structure 10 CJ series DeviceNet Units Operation Manual for NJ series CPU Unit W497 ...
Page 42: ...Revision History 40 CJ series DeviceNet Units Operation Manual for NJ series CPU Unit W497 ...
Page 345: ...Index 1 CJ series DeviceNet Units Operation Manual for NJ series CPU Unit W497 I Index ...
Page 349: ......