Tighten all screws, bolts and lock nuts of every adjustable mechanical element following
normal tightening values, without using any levers or hitting any spanners.
4.5 PRELIMINARY INSPECTIONS
The machine is inspected in the offices of the company of the Builder before being sent, so it is not
necessary to follow any particular procedure before it is operated.
The first time the machine is run, follow these instructions:
-
check that the machine has not had any damages during transport and handling;
-
check that the electric cables are intact;
-
check that the machine is correctly connected to the power supply;
-
check that all mobile and fixed guards and all safety equipment are correctly installed;
-
check that all control sensors are in the correct position.
4.6 ELECTRICAL CONNECTION (BATTERY CHARGING)
Before performing the electrical connection, check the values written on the machine label
located on the column
:
- line voltage;
- line frequency;
Moreover check:
- a grounding system is present and efficient;
- short circuit and overabsorption protection devices are present.
Check that the breaking capacity of the circuit breaker is compatible with the short circuit intensity
at circuit breaker terminals.
During machine connection to the power grid, the system has to be cut off from the power
supply, in compliance with the technical code of practice and the norms in force in the
Country of use.
IGM EN_REV4
29
Summary of Contents for Viverra
Page 1: ...Omni Viverra...
Page 15: ...2 5 OVERALL DIMENSIONS OF THE MACHINE IGM EN_REV4 15...
Page 18: ...IGM EN_REV4 18...