91.
Attach Interior
Vertical
Door Stops
to door framing from inside of shed. Use 4 - 2” screws to
secure each Stop. Stops should overlap door by approx. 1/2”.
Door Stops
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 35
90.
Assemble
Flower Box
Kit
with Assembly Instructions included.
Position completed Flower Box below bottom of window trim and secure
with 2 - 2 1/2” screws. Screw from inside of box into the center wall stud.
Attach second screw 2” underneath first screw and once again into the
wall stud. Install Flower Box Kits underneath each window.
88.
To complete trimming of your shed,
attach both the
Horizontal Door Trim
(32”)
and
Horizontal Narrow Wall Trim
(8 3/4”)
with 4 and 2 - 1 1/2” finishing nails.
89.
Attach
Horizontal Gable Trim
(1/2” x 4 1/2” x 85 1/2”) to both front and rear
of shed. Position equally over gable and
wall seam to cover Gable Flashing. Use
8 - 1 1/2” finishing nails per piece to secure.
Angle cut
on end