Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 8
16.
Lift and place a third Solid Wall Panel
on floor.
Wall flush
at front.
15.
Place a second Solid Wall Panel in the corner, positioning the wall framing flush with floor frame.
Note:
Rear walls (and front walls) will be positioned between side walls. Align vertical wall frames and
attach with 3 - 2 1/2” screws at bottom, middle and top. Have helper hold wall panels while securing.
Solid W
all Side
17.
Position and attach third wall panel. Secure vertical wall frames together with 3 - 2 1/2” screws.
2x3 wall framing of panel will sit flush with floor framing.
Rear
Rear W
all
Solid W
all Side
Rear W
all
View of Rear Corner showing Solid Wall Side
and Rear Wall orientation. Note how the Wall
2x3 bottom framing is flush to floor while siding
overhangs floor.
Front
Front
Optional:
Caulking seams
will help prevent moisture
from entering your shed.
Caulking is included to
complete Polygal Windows
only. Additional Caulking
may be required for seams.
Rear