44.
Complete installation of remaining Gussets.
46.
Position a
Polygal Support Cleat
(3/4” x 3/4” x 44 1/2”) on a Long Rafter flush to end and recessed
1/4” down from edge of rafter. Nail to rafter using 6 - 1 1/2” finishing nails. Further secure Cleats with
2 - 1 1/4” screws.
Note:
Start nails in Cleat on ground first. Complete remaining 7 Polygal Support Cleats.
D. Roof Section
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 18
Important:
Drill pilot
holes to prevent splitting!
1/4” recess
1 1/4” Screws
45.
Attach all
Single
and
Double Rafter Brackets
where rafters meet Top Wall Plates inside of shed. Attach
with 2 - 1 1/4” screws and 2 - 2” screws per Single Rafter
Bracket and 6 - 2” screws per Double Rafter Bracket.
Rafter Brackets are bent to 22 and 33
deg. Use correct bracket for each side.
Polygal Panels (4)
Metal Ridge Caps (2)
Foam Enclosures for
Metal Roof (Several)
Metal Roof Panels
Short 41” long (3)
Metal Roof Panels
Long 43” long (3)
Roof Battens Short
25 1/2” long (4)
Roof Battens Long
71” long (4)
Roof Battens Center
48 1/4” long (4)
Batten Spacers Short (4)
Batten Spacers Long (4)