Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
80.
Align and attach remaining Ridge Caps as per
Steps 78 & 79
.
82.
Attach
Side Facia
(4 @ 3/4” x 3 1/2” x 47 7/8”) to roof rafter ends. There are 2 Side Facia pieces
per side. Secure with 8 - 1 1/2” finishing nails per piece. Front and Rear Facia will overlap Side Facia.
Page 32
Center Ridge
Cap (3 1/2” w)
Do a dry run with Front and Rear and Side Facia
(
Steps 82-84
) to confirm correct positioning prior to
attaching.
81.
Attach
Facia Nailing Strips
(3/4” x 1 1/2” x 34”) to the outside of roof battens using 3- 1 1/4”
screws per piece. Do all outside roof panels.
Starting with the
Short
Roof side, attach
Front and Rear Facia
(3/4” x 3 1/2” x 38 3/4” angle cut on
ends) to end of battens with 5 - 1 1/2” finishing nails per side. Facia end lines up with rafter ends.
Do a dry run with side facia in
Step 82
before attaching.
Nailing strip
Edge of batten roof.