3. Commissioning
3.1. Fuses and switches
Switch/fuse Device
Q1
Main power
S3
Ground circulation pump
F1
Compressor 1
F2
Compressor 2 (not in RE 35 or RE 42)
F3
Ground circulation pump
F4
Condenser pump
F5
Domestic hot water circulation pump
F6
Desuperheater circulation pump (optional)
F10
Control system
3.2. Prerequisites for commissioning
The commissioning of the heat pump is allowed to do only by professionals. The
person for commissioning the system needs to:
● have qualification and competence to handle devices containing over 3 kg of
refrigerant.
● have qualification and competence for installing high pressure devices.
● have an expert knowledge of heating systems.
● be familiar with the heat pump control system and know how to change and save
the settings.
It is recommended that Oilon expert does the commissioning.
Tasks to be completed before commissioning:
● Ground circuit connected.
● Condenser circuit and desuperheater circuit connected.
● Buffer tank(s) and heating system filled and vented.
● All necessary feed cables and sensors connected.
● The heat pump’s main electrical switch (
Q1
) and all circuit breakers and motor
protection switches (
F1
–
F10
) are set to 0.
Summary of Contents for RE 110
Page 2: ......
Page 45: ...RE03 1406 EN 43 48 WIPL02 ver 1 Figure1 Wilo IPL 50 115 0 75 2...
Page 46: ...44 48 RE03 1406 EN WIPL01 ver 1 Figure2 Wilo IPL 50 120 1 5 2 and Wilo IPL 50 130 2 2 2...
Page 47: ...RE03 1406 EN 45 48 WSP03 ver 1 Figure3 Wilo Stratos Para 25 1 7...
Page 51: ......
Page 52: ...www oilon com...