97
Pompe à chaleur pour piscine à onduleur
FR
Kit de dérivation pour une pompe à chaleur
Kit de dérivation pour plusieurs pompes à chaleur
Le fi ltre en amont de la pompe à chaleur doit être nettoyé régulièrement pour assurer
la propreté de l'eau de circulation et éviter tout problème de fonctionnement dû à la
contamination ou à l'obstruction du fi ltre.
Raccordement hydraulique
3.6
13
By-Pass assembly for one heat pump
By-Pass assembly for more than one heat pump
The filter located upstream of the heat pump must be regularly cleared so that the water in the system is
clean, thus avoiding the operational problems associated with dirt or clog- ging in the filter.
sortie
Station de traite-
ment automa-
tique de l'eau
fi ltre + pompe
VERS LA PISCINE
DEPUIS LA PISCINE
piscine
entrée
13
By-Pass assembly for one heat pump
By-Pass assembly for more than one heat pump
The filter located upstream of the heat pump must be regularly cleared so that the water in the system is
clean, thus avoiding the operational problems associated with dirt or clog- ging in the filter.
sortie
sortie
fi ltre + pompe
VERS LA PISCINE
DEPUIS LA PISCINE
piscine
entrée
entrée
Station de traite-
ment automa-
tique de l'eau
11
3.3 Installation layout
3.4 Connecting the condensation draining kit
While operating, the heat pump is subject to condensation. This will result in a more or less large run-off of
water, depending on the degree of humidity. To channel this flow, we recommend that you install the
condensation drainage kit.
How do you install the condensation drainage kit|?
Install the heat pump, raising it at least 10 cm with solid water-resistant pads, then connect the drainage pipe to
the opening located under the pump.
3.5 Installing the unit on noise-damping supports
In order to minimize the noise pollution associated with heat pump vibrations, it can be positioned on vibration
absorbing pads.
To do this, you simply have to position a pad between each of the unit’s feet and its support, and then fix
the heat pump to the support with suitable screws.
vanne entièrement ouverte
vanne à moitié
ouverte
11
3.3 Installation layout
3.4 Connecting the condensation draining kit
While operating, the heat pump is subject to condensation. This will result in a more or less large run-off of
water, depending on the degree of humidity. To channel this flow, we recommend that you install the
condensation drainage kit.
How do you install the condensation drainage kit|?
Install the heat pump, raising it at least 10 cm with solid water-resistant pads, then connect the drainage pipe to
the opening located under the pump.
3.5 Installing the unit on noise-damping supports
In order to minimize the noise pollution associated with heat pump vibrations, it can be positioned on vibration
absorbing pads.
To do this, you simply have to position a pad between each of the unit’s feet and its support, and then fix
the heat pump to the support with suitable screws.