COMMISSIONING
After that all installation operations defined in the previous section have been completed, the DIAM4200
CCR can be commissioned.
III.1 PROCEDURE
1.
Close the fuse box master switches, or the main circuit breaker
2.
Be sure that the jumpers of the Cut-out plate (if option) are in
“normal” position
3.
Close the front panel of the DIAM4200
4.
Connect the installation to the power
The display lights up:
5.
Press
local
button, the display seems to:
The CCR starts up and the output current is displayed on the front panel.
6.
Progressively increase the brightness levels using the selection buttons while systematically checking
the current value shown by the numeric display, maximum brightness being fixed at 6.6A.
7.
Decrease the brightness levels again, then stop the CCR by pressing
stop
button
If the CCR does not supply the desired current, see paragraph IV.4.4
8.
Check operation of the CCR in remote control mode. (Press
auto
button )
Io:0.00A STOP
stop
local
auto
menu
Io:1.50A <B0>
stop
B-
B+
menu