Mounting instructions isCon
®
lightning protection system
Checking the lightning protection system
Note!
An insulation test can only be carried out if an isCon ASE connection
element is mounted on both sides of the isCon conductor.
Fig 68:
OBO Bettermann
(fortl.)
Art.-Nr.
Seriennr.
xxxx xxx
isCon ASE 23
U
S DC _
_
> 1.0 kV
U
W DC _
_
< 0.5 kV
P.O.Bo
D-58694 Menden
x 1120
Germany
TESTING AREA
2
3
1
Carrying out an insulation test
1. Open all the separation points
1
of the system to be checked.
2. Place the insulation measuring device between the connection elem-
ent
2
and testing point
3
or the nearest fastening clip.
3. Apply the test voltage of the insulation measurement device of
500 V DC for ≥ 3 s.
4. Continue according to the result:
I
nsulation measurement between the connection element and test
point with 500 V DC for ≥ 3 s*
Result
Measured resistance
> 500 MΩ
= Cable insulation given
< 500 MΩ
= DEFECTIVE
Measure
Function testing com-
pleted
Exchange the appropriate
isCon conductor including
isCon ASE connection elem-
ents
* Due to the ASE technology used (adaptive switching element), the
resistance value displayed on the insulation measuring device may vary.