42 | DE
OBO Bettermann
Installing the isCon® system
7 5
Fastening the air-termination rod in the tripod stand
7 5 1
Mounting the concrete base
Fig 40:
1
2
3
4
5
Concrete base with fastenings
Legend:
1
Hexagonal nuts (with washers) for height compensation
2
Lock nut (with washer and plate)
3
Concrete base
4
Edge protection
5
Threaded rod
– From below, push the threaded rod through the opening of the edge
protection and the concrete base and fix it with the lock nut.
7 5 2
Assembling the tripod stand
Risk of crushing when erecting the tripod stand!
When erecting the tripod stand, hands and other limbs may be crushed by mov-
ing parts.
When erecting the tripod stand, do not reach between moving parts!
Risk of damage!
When multiple concrete bases are used, the heavy weight can lead to damage
to the substrate.
If necessary, place protective mats under the concrete base.
Note!
To determine how many concrete bases must be used in the isFang
air-termination rod system, we recommend asking a planning office to
carry out the static calculations. You can find further information on wind-
speed zones in the OBO TBS lightning protection guide and national
directives.
CAUTION
ATTENTION