53 | DE
Mounting instructions isCon
®
lightning protection system
Installing the isCon® system
Fig 54:
x
Equipotential bonding using isCon H VA conductor holder on metallic substrate,
grey external jacket removed in contact area.
Mounting variant 2 for isCon
BA 45 SW
The conductor type isCon
BA 45 SW can also be routed without a po-
tential connection. When mounted without a potential connection, the
minimum distance (x) must be complied with in both directions, starting
from the last insulated spacer. There may be no electrically conductive
parts within the perimeter of the calculated separation distance (s) (see
Fig. 55 on page 53).
Fig 55:
x
x
s
Mounting variant for the isCon BA 45 SW conductor without potential connec-
tion.
7 8 3
Including the tripod stand in the functional equipotential bonding
Fig 56:
Rd 8-10
Connection of the equipotential bonding to the insulated tripod stand
4. Fasten the crossbar (included in scope of delivery) to the air-termina-
tion rod and connect a round conductor Rd 8-10 to the equipotential
bonding of the building.