58
EN
TEST
TEST
Fig. 24
After the two keys are pressed, the display shows:
8.4
HEATING ELEMENTS
AND MOTORS TEST
KEY:
1
COFFEE BOILER HEATING ELEMENT
2
STEAM BOILER HEATING ELEMENT
3
GROUP HEATING ELEMENT
4
RH GRINDER MOTOR
5
LH GRINDER MOTOR
6
GROUP TOP POSITION
7
GROUP BOTTOM POSITION
8
GROUP INTERMEDIATE POSITION
9
PUMP MOTOR
10
5V5 RELAY
Press the
2X/CLEANING
key to check
the correct operation of the heating elements and
motors.
1
2
3
4
5
6
7
8
9
10
Fig. 23
After pressing the two keys, the display will read:
8 .3
SOLENOID VALVE
TEST
KEY:
1
COFFEE SOLENOID’
2
LONG SOLENOID
3
AUTO LEVEL SOLENOID
4
COFFEE BOILER FILLING
5
HOT WATER SOLENOID
6
CAPPUCCINO SOLENOID
7
AUTOWASH SOLENOID
8
MILK AIR SOLENOID
9
STEAM SOLENOID
Press the
LEFT GRINDER
key to check the
correct operation of the solenoid valve coil.
1
2
3
5
6
7
8
9
4
Summary of Contents for TALENTO
Page 1: ...LIBRETTO ISTRUZIONI USER HANDBOOK ...
Page 2: ......
Page 36: ...34 IT ...
Page 69: ...67 IMPIANTO IDRAULICO PLUMBING SYSTEM 13 12 9 8 10 7 9 10 1 3 2 15 5 4 11 4 ...
Page 71: ...69 IMPIANTO ELETTRICO ELECTRICAL SYSTEM ...
Page 73: ...71 IMPIANTO ELETTRICO ELECTRICAL SYSTEM ...
Page 75: ...73 ...
Page 76: ...74 NOTE ...
Page 77: ......
Page 79: ...MANUEL D INSTRUCTIONS GEBRAUCHANWEISUNGEN INSTRUCCIONES DE MANEJO ...
Page 80: ......
Page 114: ...34 FR ...
Page 148: ...68 DE ...
Page 182: ...102 ES ...
Page 185: ...105 INSTALLATION ELECTRIQUE ELEKTROANLAGE INSTALACIÓN ELÉCTRICA ...
Page 187: ...107 INSTALLATION ELECTRIQUE ELEKTROANLAGE INSTALACIÓN ELÉCTRICA ...
Page 189: ...109 ...
Page 190: ...110 NOTE ...
Page 191: ......