The Installation Options Are: 

 

12.0   Hole in the Wall Installation For Steel & Glass Trims (using Sealing Frames) - Options: 
          Requirements for Builders Opening and Combustible or Non Combustible Shelves. 
 
13.0  Hole in the Wall Installation For Echo Trims - Options: 
          Requirements for Builders Opening and Combustible or Non Combustible Shelves. 

       

 

            

 

14.0  Hole in the Wall Installation (when using marble, slate or stone slips) - Options: 
          Requirements for Builders Opening and Combustible or Non Combustible Shelves. 
 
15.0   Fire Surround Installation - Options: 
          Requirements for Builders Opening and Combustible or Non Combustible Shelves/Mantels. 

            

 

            

 

16.0   Installation for a Wall Mounted Televisions - With Options Above.

 

 
                 IMPORTANT : ALL RELEVANT SECTIONS SHOULD BE CONSIDERED BEFORE ANY BUILDING WORK. 

 

12.1 - SEALING FRAME & WALL COVERINGS 

With any form of heating appliance convection air will rise up through the fire carrying particles of dust that will in time result in 
varying degrees of wall staining.  The Nu-Flame Sealing Frames (& for Perspective Glass the Glass Shelf) are designed to minimise 
this by deflecting the airflow away from the wall. However, over time some staining might occur and we therefore suggest not using 
patterned paper around the fire. 
 

Due to the heat output of The Synergy Range it is not recommended to use blown vinyl wall covering around the fire. 
 

12.2  HOLE IN THE WALL APPLICATION 

(FOR STEEL & GLASS TRIMS WITH SEALING FRAMES

 

  

   a.  

It is recommended that a qualified builder constructs the   

            builders opening. 

     b.  

It is recommended that a lintel is fitted above the builders 

 

  opening, structural checks may be required. 

     c. 

   The builders opening must be constructed from  

 

  Non-combustible materials. 

    d.    No

 combustible materials must present in the builders  

    

 opening. 

     e.   

The base of the builders opening must be flat, level and   

 

 square to the wall. 

      f.  

The builders opening should have provision for a gas  

            supply through the rear, see Section 11 Gas Supply.   

     g.  

There must be a flat surface around the face of the builders 

 

  opening as detailed in Section 8b and is dependant on the  

           Trim Style. This is essential in order to achieve a  good seal 
           between the wall and the sealing frame. 

     h.  

The 

recommended

 height for the base of the Builders  

  

 Opening is 400mm above floor level. The 

minimum 

height 

 

for the base of the Builders Opening is 250mm above floor 

 

level.  

     i.  

The fire is fitted with Electronic Equipment, which is sensitive 

 

to dampness and high humidity so it is very 

important

 that 

Notes

 

any rendering/building work is allowed to thoroughly dry out  

At 285mm deep a Sealing Frame Will be Required

 

before Installation. 

              The builders opening can taper towards the back to a minimum of 750mm and must be 285mm deep.  

 

 

! IMPORTANT !  

Dry lined walls – ensure that any air gaps between the back of the plasterboard and wall are sealed around the 

builders opening or fireplace as this can affect flue pull and wall staining.

 

Sections 11 - 14 Detail Various Installation Options - Only one will apply. 

! IMPORTANT NOTE !   

The chosen installation should have been predetermined 

with any parts ordered before any Building Work Is Started or Installation of the fire. 
If a Wall Mounted Television is Being Considered Read Section 16  First. 

12.  HOLE IN THE WALL INSTALLATION

 

(USING SEALING FRAMES) 

 

  ONLY APPLIES TO SYNERGY ELLESSE STEEL & GLASS WITH SEALING FRAME 

     

NOTE:  THE STEEL TRIM STYLE CANNOT BE WALL MOUNTED WITH A WALL MOUNTED TELEVISION 

     HOWEVER THE GLASS TRIM STYLE WITH GLASS SHELF & TV SHELF ARE SUITABLE SEE SECTION 16 

BUILDERS OPENING (MINIMUM SIZES) FOR HOLE IN 
THE WALL APPLICATION 

(USING SEALING FRAME)

 

Summary of Contents for SYNERGY ELLESSE

Page 1: ...FIRE IS HEAVY AND ASSISTANCE SHOULD BE SOUGHT WHEN LIFTING ALL INSTRUCTIONS MUST BE LEFT WITH THE USER FOR SAFE KEEPING MANUFACTURED by Nu Flame Limited Unit 4 Kimpton Trade Business Centre Minden Ro...

Page 2: ...12 Hole in the Wall Installations for Steel Glass Trim Styles 12 With Appropriate Sealing Frame 13 Hole in the Wall Installations for Echo Trim Style 14 14 Hole in the Wall Installations with Marble...

Page 3: ...rone to being chipped or scratching 1 2 Removal of Components a Fires Ordered with Steel or Glass Trims i The Outer Door will have to be removed and stored carefully to allow access for removal of the...

Page 4: ...he Fire can be installed into a suitably designed fire surround with a 150 C Rating v Take care with some Micro Marble Materials claiming a 150 C Rating as they may give off odours blister or discolou...

Page 5: ...nked by arrow Please note that you can have the flame height anywhere between maximum and preset low For fine adjustment simply tap the large and small flame buttons d Switching Off Press the red off...

Page 6: ...esent room temperature the fire will go straight to the Standby Setting until the temperature drops below the Set Temperature at which point the main burner will relight Note The Room Temperature is s...

Page 7: ...ELDERLY OR INFIRM OR PETS ARE LEFT IN ATTENDANCE 3 5 RESETTING THE MERTIK MAXITROL LOGIC CIRCUITS IF THE HANDSET DOES NOT WORK APPLIES TO BOTH CONTROL SYSTEMS Must only be done when the fire is Cool B...

Page 8: ...of the door Follow instructions in section b above e The logs must not be cleaned or moved f The outer surfaces of the fire can be cleaned with a damp lint free cloth do not use abrasive cleaners IMPO...

Page 9: ...FORE PROCEEDING WITH THE INSTALLATION READ THESE INSTRUCTIONS CAREFULLY THESE INSTRUCTIONS SHOULD BE LEFT WITH THE USER FOR SAFE KEEPING AND FUTURE SERVICING PRIOR TO INSTALLATION ENSURE THAT THE GAS...

Page 10: ...Height mm Synergy Ellesse Echo Trim with Metal Door 1140mm 540mm Synergy Ellesse Echo Trim with Glass Door 1140mm 540mm Synergy Ellesse Steel Trim No Sealing Frame 1135mm 560mm Synergy Ellesse Steel...

Page 11: ...PPLIANCE SEEK EXPERT ADVICE 10 VENTILATION a No additional purpose provided ventilation is normally required for the fire when installed in the UK however this must be confirmed by the Spillage Test s...

Page 12: ...rials d No combustible materials must present in the builders opening e The base of the builders opening must be flat level and square to the wall f The builders opening should have provision for a ga...

Page 13: ...rs opening d If the silicone sealing strip is not compressed and there are gaps they must be filled with a suitable sealant fireclay or high temperature silicone Wall staining may occur if the seals a...

Page 14: ...placed too close e No combustible material e g curtains must be closer than 500mm to the builders opening The wall between the sealing frame and any shelf would become hot Therefore we do not recomme...

Page 15: ...with a suitable sealant fireclay or high temperature silicone j Refit the burner mounting plate assembly by first putting the Receiver through the opening then tilt the assembly and slide it into the...

Page 16: ...ng structural check may be required c The builders opening must be constructed from Non combustible materials d No combustible materials must present in the builders opening e The base of the builders...

Page 17: ...ay in position to make a seal against the top edge of the slip at the base of the builders opening and the front face of the slips where they locate against the rear of the Fire outer frame While slid...

Page 18: ...any rendering building work is allowed to thoroughly dry out before Installation IMPORTANT Dry lined walls ensure that any air gaps between the back of the plasterboard and wall are sealed around the...

Page 19: ...slightly and slide it home ensuring that the sealing strips on the underside of the front riser channel and the rear of the Fire outer frame stay in position to make a seal against the base of the fi...

Page 20: ...y Breast will occur e The Wall Mounted Television must be mounted on a suitable bracket or angled bracket that meets the Television Manufacturer s requirements and spaces the Television at least 35mm...

Page 21: ...osition for a Wall Mounted Television Must meet the Installation Requirements of these Instructions e The Nu Flame Television Glass Heat Shield is only suitable for the Nu Flame Synergy Range of Gas F...

Page 22: ...the Fire s Installation Instructions and the Fire Surround meets the Minimum Dimensions as detailed in the Diagrams Below b You Must take account of the Television Manufacturer s Installation requirem...

Page 23: ...fuel tray g Place the large rear log No 1 to the rear of the fire on the fuel tray ensuring that the cut out in the log sits behind the pilot shield and that it is central about the burner h Place lo...

Page 24: ...n the log support at the front k Place log No 5 next to log No 6 locating it on the peg and the cut out in the rear log l Place the last log No 4 so that it locates on the central peg and rests in the...

Page 25: ...Emberglow material is a consumable material and as a limited life You can buy replacements through your local Nu Flame Ltd Stockist or Installer q For Synergy Perspective Glass Wall Mounted Installati...

Page 26: ...m or adjacent rooms running at high The fire should continue to clear its combustion products Also operate any other flued appliance in the same or neighbouring rooms and ensure they continue to funct...

Page 27: ...ii Now secure the upper Hinge Pin with the fixing screw provided as shown the door should then be closed and held shut by the magnet catches Very Important The Hinge Pin Screw Must be fitted to ensur...

Page 28: ...SES WHEN LIT 20 SERVICING 20 1 GENERAL Note Servicing must be carried out by a registered installer a The fire does not have to be removed for Servicing b Check the operation and ignition of the fire...

Page 29: ...Burner Control Assembly to Nu Flame for rectification as this could be the least cost option 21 3 PILOT GOES OUT AFTER FIRST LIGHTING a Check there is no vermiculite blocking the flame to the thermoco...

Page 30: ...ork d Change the Handset and or Receiver and or Burner Control System Important In instances where it is indicating that either of the main control systems need changing you should investigate returni...

Page 31: ...5 4 The fire must be Installed serviced by a properly qualified in accordance with Local National Codes Installation Engineer and in accordance with these Installation Instructions Supplier Nu Flame L...

Page 32: ...fire must be Installed serviced by a properly qualified in accordance with Local National Codes Installation Engineer and in accordance with these Installation Instructions Supplier Nu Flame Limited...

Page 33: ...33 23 DIAGRAM OF INFRARED CONTROL SYSTEM...

Page 34: ...elivery to us We will not be liable for any such breakages or losses Under no circumstances should any attempt be made to repair the burner on site without our express knowledge and approval during th...

Reviews: