This Application does not require the Sealing Frames & with the Synergy Perspective Glass, the Glass Shelf. 

 

For This Application a Riser Plate is Fitted That Raises The Fire To Enable The Door To Be Opened  

Therefore The Fireplace Opening is 30mm Higher. 

 

In this Application as a fire surround is being used we supply a Cable Fixing System as Drill Fixing may result in cracking of 
the back panel, which may not show until the fire has got hot and then cooled down over a number of operations.  

 

Nu-Flame will not accept responsibility for Cracked Back Panels due to Drill Fixing. 

 

15.1

  

FIRE SURROUND APPLICATIONS   

 

 

 

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Notes: There must be no combustible materials inside the builders opening.    

   

         The builders opening can taper towards the back to a minimum of 750mm and must be 300mm deep.  

                    

 

 
15.2 - FIRE SURROUND REQUIREMENTS  

a.

   If the Fire is to be fitted into a purpose made Fire Surround it must have a temperature rating of 150

º

C. Take care with some  

      micro marbles and the adhesives used claiming 150

º

C rating as they can be prone to blistering and can give off odour.              

b.  

The Fire requires a non-combustible hearth of at least 12mm thick. 

c.  

The surface of the hearth must stand at least 50mm above the floor and level with the fireplace opening. 

d.  

The hearth must project at least 300mm in front of the fireplace opening and 150mm either side (1080mm minimum width). 

e.  

The base of the fireplace must be flat, level and square to the face of the fireplace opening. 

f.

   There can be 

no 

up stand around the hearth as the door of the fire has to be opened.  

g. 

The surround must cater for a minimum flat surface around the Fireplace Opening allowing 100mm above the opening and 125mm 
on each side.  This is essential in order to achieve a good seal between the face of the Surround back panel and the Fire sealing 
Flange.

 

h.

  The fire is fitted with Electronic Equipment, which is sensitive to dampness and high humidity so it is very 

important

 that any  

      rendering/building work is allowed  to thoroughly dry out before Installation. 

 

  ! IMPORTANT !  

Dry lined walls – ensure that any air gaps between the back of the plasterboard and wall are sealed around 
the builders opening or fireplace as this can affect flue pull and wall staining.

 

                                                                                                 

15.3 - CLEARANCES TO SHELVES & COMBUSTIBLE MATERIALS (Ref: Diagram Above) 

a.

   A 

non combustible

 shelf can be fitted above the fire and should be positioned at least 95mm above the builders opening. We recom-

mend the depth of the shelf should be a maximum of 75mm as anything deeper will reduce convection air and the  

 

efficiency of the fire. For deeper non-combustible shelves they must be raised a further 25mm for every extra 25mm of depth. 

b.

   A 150mm 

combustible

 shelf can be fitted above the fire but must be positioned at least 350mm above the builders opening. 

(1025mm minimum from base of fireplace opening). For deeper combustible shelves they must be raised a further 25mm for every 
extra 25mm of depth. 

c.  

Any combustible sidewall must be at least 500mm from the inside of the builders/fireplace opening, however  with a combustible fire 
surround it can be 150mm from the inside of the builders/fireplace opening provided it does not protrude more than 150mm and 
must be increased by 25mm for every extra 25mm of depth. 

d.

   With all heating appliances, soft furnishings, decorations and wall coverings may discolour or scorch if placed too close. 

e.

  No combustible material, e.g. curtains must be closer than 500mm to the builders opening. 

f.

  Any combustible wall claddings (wall paper) must be cut back to the perimeter of the shelf and slips or to a height of 875mm and 

140mm either side of the Fireplace Opening. 

CUTOUT SIZE FOR FIRE SURROUND  

APPLICATION

 

15.   FIRE SURROUND INSTALLATIONS - Steel & Glass Trim Options with Riser Plate 

 

If a Wall Mounted Television is being Considered Also Make Reference to Section 16 

       The Echo Trim Style is Not considered suitable for a Traditional Fire Surround and will require a Bespoke Design. 

 

  Any design should allow for a 150mm minimum deep shelf if a Wall Mounted Television is being considered.  

 

FIREPLACE 

CONSTRUCTION 

Summary of Contents for SYNERGY ELLESSE

Page 1: ...FIRE IS HEAVY AND ASSISTANCE SHOULD BE SOUGHT WHEN LIFTING ALL INSTRUCTIONS MUST BE LEFT WITH THE USER FOR SAFE KEEPING MANUFACTURED by Nu Flame Limited Unit 4 Kimpton Trade Business Centre Minden Ro...

Page 2: ...12 Hole in the Wall Installations for Steel Glass Trim Styles 12 With Appropriate Sealing Frame 13 Hole in the Wall Installations for Echo Trim Style 14 14 Hole in the Wall Installations with Marble...

Page 3: ...rone to being chipped or scratching 1 2 Removal of Components a Fires Ordered with Steel or Glass Trims i The Outer Door will have to be removed and stored carefully to allow access for removal of the...

Page 4: ...he Fire can be installed into a suitably designed fire surround with a 150 C Rating v Take care with some Micro Marble Materials claiming a 150 C Rating as they may give off odours blister or discolou...

Page 5: ...nked by arrow Please note that you can have the flame height anywhere between maximum and preset low For fine adjustment simply tap the large and small flame buttons d Switching Off Press the red off...

Page 6: ...esent room temperature the fire will go straight to the Standby Setting until the temperature drops below the Set Temperature at which point the main burner will relight Note The Room Temperature is s...

Page 7: ...ELDERLY OR INFIRM OR PETS ARE LEFT IN ATTENDANCE 3 5 RESETTING THE MERTIK MAXITROL LOGIC CIRCUITS IF THE HANDSET DOES NOT WORK APPLIES TO BOTH CONTROL SYSTEMS Must only be done when the fire is Cool B...

Page 8: ...of the door Follow instructions in section b above e The logs must not be cleaned or moved f The outer surfaces of the fire can be cleaned with a damp lint free cloth do not use abrasive cleaners IMPO...

Page 9: ...FORE PROCEEDING WITH THE INSTALLATION READ THESE INSTRUCTIONS CAREFULLY THESE INSTRUCTIONS SHOULD BE LEFT WITH THE USER FOR SAFE KEEPING AND FUTURE SERVICING PRIOR TO INSTALLATION ENSURE THAT THE GAS...

Page 10: ...Height mm Synergy Ellesse Echo Trim with Metal Door 1140mm 540mm Synergy Ellesse Echo Trim with Glass Door 1140mm 540mm Synergy Ellesse Steel Trim No Sealing Frame 1135mm 560mm Synergy Ellesse Steel...

Page 11: ...PPLIANCE SEEK EXPERT ADVICE 10 VENTILATION a No additional purpose provided ventilation is normally required for the fire when installed in the UK however this must be confirmed by the Spillage Test s...

Page 12: ...rials d No combustible materials must present in the builders opening e The base of the builders opening must be flat level and square to the wall f The builders opening should have provision for a ga...

Page 13: ...rs opening d If the silicone sealing strip is not compressed and there are gaps they must be filled with a suitable sealant fireclay or high temperature silicone Wall staining may occur if the seals a...

Page 14: ...placed too close e No combustible material e g curtains must be closer than 500mm to the builders opening The wall between the sealing frame and any shelf would become hot Therefore we do not recomme...

Page 15: ...with a suitable sealant fireclay or high temperature silicone j Refit the burner mounting plate assembly by first putting the Receiver through the opening then tilt the assembly and slide it into the...

Page 16: ...ng structural check may be required c The builders opening must be constructed from Non combustible materials d No combustible materials must present in the builders opening e The base of the builders...

Page 17: ...ay in position to make a seal against the top edge of the slip at the base of the builders opening and the front face of the slips where they locate against the rear of the Fire outer frame While slid...

Page 18: ...any rendering building work is allowed to thoroughly dry out before Installation IMPORTANT Dry lined walls ensure that any air gaps between the back of the plasterboard and wall are sealed around the...

Page 19: ...slightly and slide it home ensuring that the sealing strips on the underside of the front riser channel and the rear of the Fire outer frame stay in position to make a seal against the base of the fi...

Page 20: ...y Breast will occur e The Wall Mounted Television must be mounted on a suitable bracket or angled bracket that meets the Television Manufacturer s requirements and spaces the Television at least 35mm...

Page 21: ...osition for a Wall Mounted Television Must meet the Installation Requirements of these Instructions e The Nu Flame Television Glass Heat Shield is only suitable for the Nu Flame Synergy Range of Gas F...

Page 22: ...the Fire s Installation Instructions and the Fire Surround meets the Minimum Dimensions as detailed in the Diagrams Below b You Must take account of the Television Manufacturer s Installation requirem...

Page 23: ...fuel tray g Place the large rear log No 1 to the rear of the fire on the fuel tray ensuring that the cut out in the log sits behind the pilot shield and that it is central about the burner h Place lo...

Page 24: ...n the log support at the front k Place log No 5 next to log No 6 locating it on the peg and the cut out in the rear log l Place the last log No 4 so that it locates on the central peg and rests in the...

Page 25: ...Emberglow material is a consumable material and as a limited life You can buy replacements through your local Nu Flame Ltd Stockist or Installer q For Synergy Perspective Glass Wall Mounted Installati...

Page 26: ...m or adjacent rooms running at high The fire should continue to clear its combustion products Also operate any other flued appliance in the same or neighbouring rooms and ensure they continue to funct...

Page 27: ...ii Now secure the upper Hinge Pin with the fixing screw provided as shown the door should then be closed and held shut by the magnet catches Very Important The Hinge Pin Screw Must be fitted to ensur...

Page 28: ...SES WHEN LIT 20 SERVICING 20 1 GENERAL Note Servicing must be carried out by a registered installer a The fire does not have to be removed for Servicing b Check the operation and ignition of the fire...

Page 29: ...Burner Control Assembly to Nu Flame for rectification as this could be the least cost option 21 3 PILOT GOES OUT AFTER FIRST LIGHTING a Check there is no vermiculite blocking the flame to the thermoco...

Page 30: ...ork d Change the Handset and or Receiver and or Burner Control System Important In instances where it is indicating that either of the main control systems need changing you should investigate returni...

Page 31: ...5 4 The fire must be Installed serviced by a properly qualified in accordance with Local National Codes Installation Engineer and in accordance with these Installation Instructions Supplier Nu Flame L...

Page 32: ...fire must be Installed serviced by a properly qualified in accordance with Local National Codes Installation Engineer and in accordance with these Installation Instructions Supplier Nu Flame Limited...

Page 33: ...33 23 DIAGRAM OF INFRARED CONTROL SYSTEM...

Page 34: ...elivery to us We will not be liable for any such breakages or losses Under no circumstances should any attempt be made to repair the burner on site without our express knowledge and approval during th...

Reviews: