background image

34 

 

 
 
 
 
 
 

 
Telephone 020 8254 6802 

 
 
Nu-Flame Warranty and Repair Procedure for The Synergy Ellesse.

 

 
The Nu-Flame Synergy Ellesse is guaranteed for 1 year from the date of purchase.  During that time our guarantee is to send  
replacement parts for a fire that proves to have faulty components or workmanship.  At our option we may decide to repair, or           
replace, at no charge a fire that proves to have faulty components or workmanship. 
 

Telephone Help Line.

  In the event of a problem with a fire the first course of action should be to telephone our technical  

department on 020 8254 6802 during normal working hours 9 - 5.30 Monday - Friday (closed 1 - 1.30).  If possible this should be 
done before the installer leaves site as we may well be able to resolve the problem over the phone, and, in any event it will save the 
installer a return visit to site.  If we are not able to resolve the problem over the phone we will decide the most expedient way of  
resolving the problem and this is likely to be to send replacement parts.  It is possible that we will ask you to return the fire or parts of 
the fire and if this is the case we will log your details and give you a return reference number. 
 

Returning the Fire and parts thereof.  

After assessment we might consider it best to return part of the appliance, such as 

the burner only, for testing. In this example the burner can then be thoroughly inspected and any signs of installation faults can be  
reported back to you.  After any repair work is carried out the flow rates can be checked and re-set if necessary in order to fully  
comply with CE approval.  

Note:

 It is a condition of the warranty that you do not return any parts to us unless we request you to do 

so.  For example if we request that the burner only is returned and you send the entire appliance, the fuel bed and other items could 
be damaged of lost during the return delivery to us.  We will not be liable for any such breakages, or losses 
 
Under no circumstances should any attempt be made to repair the burner on site without our express knowledge and approval  
during the warranty period. 
 
This guarantee is given subject to the following provisions: 
 
1.  That the installation is carried out by a GAS SAFE registered installer (we may require their registration details). 
2.  That the appliance is installed and used in accordance with our Installation & User instructions. 
3.  That the gas supply pressure at the appliance is not more than 3mbar below the gas pressure stated on the data plate when the 

appliance is running on high flame, with any other major gas appliances also running. 

4.  That the fireplace and flue system conform to relevant local codes, building regulations and British Standards. 
5.  This Guarantee is not transferable and relates to the original installation only. 
6.  The appliance has not been subject to misuse or accident or been modified or repaired by any person other than the authorised 

employee or authorised representative of Nu-Flame Ltd. 

7.  The Record Data section on the front of the Installation & Servicing Instructions is to be completed on installation. 
8.  Nu-Flame Ltd accepts no liability for any consequential loss or damage arising from the use or failure of the product or any  
 

information provided, including, but not limited to, economic or financial loss, damage to peripheral equipment or products, loss 
of use, productivity or time. 

9.  That the serial no. data plate on the burner is intact. 
 
This guarantee in no way reduces your statutory rights. 
 
This guarantee supersedes any previously published guarantees. 
 

Chargeable Repairs During And After The Warranty Period 

If a repair is chargeable during the warranty period, due to installation faults we will inform you and where possible give you a quote, 
or if this is not possible, a price guide before starting work.  We cannot always give a firm cost until we commence the repair as it is 
not always possible to tell which components have been damaged. 

Summary of Contents for SYNERGY ELLESSE

Page 1: ...FIRE IS HEAVY AND ASSISTANCE SHOULD BE SOUGHT WHEN LIFTING ALL INSTRUCTIONS MUST BE LEFT WITH THE USER FOR SAFE KEEPING MANUFACTURED by Nu Flame Limited Unit 4 Kimpton Trade Business Centre Minden Ro...

Page 2: ...12 Hole in the Wall Installations for Steel Glass Trim Styles 12 With Appropriate Sealing Frame 13 Hole in the Wall Installations for Echo Trim Style 14 14 Hole in the Wall Installations with Marble...

Page 3: ...rone to being chipped or scratching 1 2 Removal of Components a Fires Ordered with Steel or Glass Trims i The Outer Door will have to be removed and stored carefully to allow access for removal of the...

Page 4: ...he Fire can be installed into a suitably designed fire surround with a 150 C Rating v Take care with some Micro Marble Materials claiming a 150 C Rating as they may give off odours blister or discolou...

Page 5: ...nked by arrow Please note that you can have the flame height anywhere between maximum and preset low For fine adjustment simply tap the large and small flame buttons d Switching Off Press the red off...

Page 6: ...esent room temperature the fire will go straight to the Standby Setting until the temperature drops below the Set Temperature at which point the main burner will relight Note The Room Temperature is s...

Page 7: ...ELDERLY OR INFIRM OR PETS ARE LEFT IN ATTENDANCE 3 5 RESETTING THE MERTIK MAXITROL LOGIC CIRCUITS IF THE HANDSET DOES NOT WORK APPLIES TO BOTH CONTROL SYSTEMS Must only be done when the fire is Cool B...

Page 8: ...of the door Follow instructions in section b above e The logs must not be cleaned or moved f The outer surfaces of the fire can be cleaned with a damp lint free cloth do not use abrasive cleaners IMPO...

Page 9: ...FORE PROCEEDING WITH THE INSTALLATION READ THESE INSTRUCTIONS CAREFULLY THESE INSTRUCTIONS SHOULD BE LEFT WITH THE USER FOR SAFE KEEPING AND FUTURE SERVICING PRIOR TO INSTALLATION ENSURE THAT THE GAS...

Page 10: ...Height mm Synergy Ellesse Echo Trim with Metal Door 1140mm 540mm Synergy Ellesse Echo Trim with Glass Door 1140mm 540mm Synergy Ellesse Steel Trim No Sealing Frame 1135mm 560mm Synergy Ellesse Steel...

Page 11: ...PPLIANCE SEEK EXPERT ADVICE 10 VENTILATION a No additional purpose provided ventilation is normally required for the fire when installed in the UK however this must be confirmed by the Spillage Test s...

Page 12: ...rials d No combustible materials must present in the builders opening e The base of the builders opening must be flat level and square to the wall f The builders opening should have provision for a ga...

Page 13: ...rs opening d If the silicone sealing strip is not compressed and there are gaps they must be filled with a suitable sealant fireclay or high temperature silicone Wall staining may occur if the seals a...

Page 14: ...placed too close e No combustible material e g curtains must be closer than 500mm to the builders opening The wall between the sealing frame and any shelf would become hot Therefore we do not recomme...

Page 15: ...with a suitable sealant fireclay or high temperature silicone j Refit the burner mounting plate assembly by first putting the Receiver through the opening then tilt the assembly and slide it into the...

Page 16: ...ng structural check may be required c The builders opening must be constructed from Non combustible materials d No combustible materials must present in the builders opening e The base of the builders...

Page 17: ...ay in position to make a seal against the top edge of the slip at the base of the builders opening and the front face of the slips where they locate against the rear of the Fire outer frame While slid...

Page 18: ...any rendering building work is allowed to thoroughly dry out before Installation IMPORTANT Dry lined walls ensure that any air gaps between the back of the plasterboard and wall are sealed around the...

Page 19: ...slightly and slide it home ensuring that the sealing strips on the underside of the front riser channel and the rear of the Fire outer frame stay in position to make a seal against the base of the fi...

Page 20: ...y Breast will occur e The Wall Mounted Television must be mounted on a suitable bracket or angled bracket that meets the Television Manufacturer s requirements and spaces the Television at least 35mm...

Page 21: ...osition for a Wall Mounted Television Must meet the Installation Requirements of these Instructions e The Nu Flame Television Glass Heat Shield is only suitable for the Nu Flame Synergy Range of Gas F...

Page 22: ...the Fire s Installation Instructions and the Fire Surround meets the Minimum Dimensions as detailed in the Diagrams Below b You Must take account of the Television Manufacturer s Installation requirem...

Page 23: ...fuel tray g Place the large rear log No 1 to the rear of the fire on the fuel tray ensuring that the cut out in the log sits behind the pilot shield and that it is central about the burner h Place lo...

Page 24: ...n the log support at the front k Place log No 5 next to log No 6 locating it on the peg and the cut out in the rear log l Place the last log No 4 so that it locates on the central peg and rests in the...

Page 25: ...Emberglow material is a consumable material and as a limited life You can buy replacements through your local Nu Flame Ltd Stockist or Installer q For Synergy Perspective Glass Wall Mounted Installati...

Page 26: ...m or adjacent rooms running at high The fire should continue to clear its combustion products Also operate any other flued appliance in the same or neighbouring rooms and ensure they continue to funct...

Page 27: ...ii Now secure the upper Hinge Pin with the fixing screw provided as shown the door should then be closed and held shut by the magnet catches Very Important The Hinge Pin Screw Must be fitted to ensur...

Page 28: ...SES WHEN LIT 20 SERVICING 20 1 GENERAL Note Servicing must be carried out by a registered installer a The fire does not have to be removed for Servicing b Check the operation and ignition of the fire...

Page 29: ...Burner Control Assembly to Nu Flame for rectification as this could be the least cost option 21 3 PILOT GOES OUT AFTER FIRST LIGHTING a Check there is no vermiculite blocking the flame to the thermoco...

Page 30: ...ork d Change the Handset and or Receiver and or Burner Control System Important In instances where it is indicating that either of the main control systems need changing you should investigate returni...

Page 31: ...5 4 The fire must be Installed serviced by a properly qualified in accordance with Local National Codes Installation Engineer and in accordance with these Installation Instructions Supplier Nu Flame L...

Page 32: ...fire must be Installed serviced by a properly qualified in accordance with Local National Codes Installation Engineer and in accordance with these Installation Instructions Supplier Nu Flame Limited...

Page 33: ...33 23 DIAGRAM OF INFRARED CONTROL SYSTEM...

Page 34: ...elivery to us We will not be liable for any such breakages or losses Under no circumstances should any attempt be made to repair the burner on site without our express knowledge and approval during th...

Reviews: