NRG USER MANUAL
SymphoniePLUS3 User Guide
SymphoniePLUS3_DataLogger_Manual
Rev. 17
[email protected] | Page 61
31 December 2018
Mounting the iPack and Logger in a Shelter Box
Prior to mounting to a tower, the SymphoniePLUS3 logger and iPack should first be installed in a shelter
box to protect them from the elements.
Steel NRG Shelter Box
The steel shelter box depicted below is no longer sold, however, they may still be encountered at
current installations.
1.
Connect Logger and iPack
Remove the protective water resistant sticker from the back of the logger to expose the plug. Carefully
the iPack to the plug while avoiding bending any of the pins.
2.
Mount inside the Shelter Box
Mounting holes are pre-drilled in the shelter box. To install a SymphoniePLUS3 with an iPack, insert four
10-32 x 2 ½ inches mounting bolts through the mounting holes in the back of the shelter box, through
the iPack, and then align with the threaded mounting holes in the back of the logger and tighten.
If your shelter box has keyhole slots, insert the mounting bolts through the iPack and logger assembly
and screw them in until they are about 1 cm away from the back of the iPack. The SymphoniePLUS3 and
iPack can be hung in the shelter box by inserting the mounting screws in the keyhole slots. The
mounting screws can then be tightened from the back of the shelter box.