4.3. Installing
4. Preparing for use
JOB_ACTIVE_OUT
indicates that the job is active
JOB_FAILED_OUT
indicates that the job failed either because of
a JOB_ABORT_IN signal or another event
JOB_COMPLETED_OUT
indicates that the job has been success-
fully completed
DEVICES_SAFE_OUT
indicates that all managed devices are in the
power state
Armed
DEVICES_READY_OUT
indicates that all managed devices are in
the power state
Ready
and in the error state
OK
DEVICES_AWAKE_OUT
if the ATTENTION_IN signal is active or if a
job is running then this signal indicates that all managed devices
are in the power state
Ready
regardless of the error state
DEVICES_FAILURE_OUT
indicates that at least one managed de-
vice is in error state
Failure
WIRING EXAMPLES
200 µA
(2 mA since
firmware
version
2.7.0.672)
Figure 4.4.: Connecting a npn-PLC to the PLC and PLC AUX connector
48
ASC_ARGNET-series_manual, 2022-02-15
Summary of Contents for ARGNET ASC-1
Page 6: ...Contents A 5 Declaration of conformity 99 vi ASC_ARGNET series_manual 2022 02 15...
Page 10: ......
Page 109: ......